Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 1 of 35
Procurement Policy 2021
1. Introduction
1.1. Background
Council recognises that developing a procurement strategy and adopting best
practice contracting and procurement principles, policies, processes and procedures
for all goods, services and works purchased by Council, will enhance achievement of
Council's objectives such as:
Sustainable and socially responsible procurement;
Bottom-line cost savings;
Supporting local economies;
Achieving innovation;
Better services for our communities; and
Best value outcomes.
Council acknowledges that the elements of best practice applicable to local
government procurement incorporate:
Broad principles covering ethics, value for money, responsibilities and
accountabilities;
Guidelines giving effect to those principles;
A system of delegations (i.e. the authorisation of officers to approve and
undertake a range of functions in the procurement process);
Procurement processes, with appropriate procedures covering minor, simple
procurement to high value, more complex procurement;
Continuous improvement practices for identifying and implementing initiatives
to reduce cost and complexity, improved productivity and buyer convenience;
and
A professional approach to all procurement related activities.
Council requires that its contracting, purchasing and contract management activities:
Support the Council’s corporate strategies, aims and objectives including but
not limited to those related to sustainability, protection of the environment,
and corporate social responsibility;
Generate and support business in the local community;
Span the whole life cycle of an acquisition from initial concept to the end of
the useful life of an asset, including its disposal, or the end of a service
contract;
Take a long term strategic view of its procurement needs while continually
assessing, reviewing and auditing its procedures, strategy and objectives;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 2 of 35
Provide a robust and transparent audit trail which ensures that procurement
projects are delivered on time, within cost constraints and that the needs of
end users are fully met;
Are conducted, and are seen to be conducted, in an impartial, fair and ethical
manner;
Achieve value for money and quality in the acquisition of goods, services and
works by Council;
Can demonstrate that public money has been well spent;
Ensure that risk is identified, assessed and managed at all stages of the
procurement process;
Seek continuous improvement including the exploration of innovation and
technology initiatives to reduce activity cost and risk;
Use strategic procurement practices and innovative procurement solutions to
promote sustainability and best value, in particular making use of
collaboration and partnership opportunities;
Comply with legislation, corporate policies or other requirements, ensuring
Councillors are aware of and adhere to those requirements, and
All staff responsible for procurement and contract management are
adequately trained in procurement processes and procedures.
1.2. Purpose and Scope
This Procurement Policy is developed in accordance with Section 108 and 109 of the
Local Government Act 2020
(the Act). These sections of the Act require Council to
prepare, approve and comply with a Procurement Policy encompassing the principles,
processes and procedures applied to all purchases of goods, services and works by
Council. It requires that the policy be reviewed at least once during each 4 year term
of the Council.
The key legislative requirements for this Policy include:
section 108 of the Act (Procurement Policy)
section 109 of the Act (Procurement)
section 4 of the Act (Objectives of Act)
section 101 of the Act (Financial management principles)
sections 106 of the Act (Service performance principles)
sections 126 to 131 of the Act (Conflict of interest)
section 11 and 47 of the Act (Delegations)
section 105 the Act (Accounts and records)
Under the Act a Council must comply with its Procurement Policy before entering into
a contract for the purchase of goods or services or the carrying out of works, as
such, this policy applies to all Councillors, Council staff, temporary employees,
contractors and consultants engaged by Council for all contracting and procurement
activities at Council and is binding upon Councillors and Council staff while engaged
by Council.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 3 of 35
The Act and the Procurement Policy are the primary reference points for how all
procurement should be performed, and represents the principles that will be applied
to all procurement activities, which includes sustainable practices of environmental,
economic and social performance undertaken by Council.
This Policy is to be read in conjunction with:
Brimbank City Council Instruments of Delegations and Financial Authority
Limits
Brimbank Contract Management Manual
Brimbank Tendering Manual
Brimbank Request for Quotation Manual
Open Windows Contracts – Contract Management Guide
eProcure Operator User Guide
Brimbank Purchasing Card Facility Procedure
Brimbank Employee Code of Conduct
Brimbank Councillor Code of Conduct
Brimbank Fraud Prevention Policy
Brimbank Acceptance and Declaration of Gifts Policy – Staff
Other references are:
Local Government Act 2020
Service Performance Principles Legislation 2020
Competition and Consumer Act 2010 (previously Trade Practices Act
)
Victorian Occupational Health and Safety Act 2004
National Competition Policy
(NCP)
Victorian Equal Opportunity Act 2010
Victorian Charter of Human Rights and Responsibilities Act 2006
Privacy and Data Protection Act 2014
Freedom Information Act 1982
Municipal Association of Victoria (MAV) Model Procurement Policy 2011
Victorian Local Government Best Practice Procurement Guidelines 2021
Brimbank Community Vision 2040
Brimbank Council Plan 2021-2025
Brimbank Social Justice Charter
Brimbank Climate Emergency Plan 2020-2025
Brimbank Risk Management Policy
Brimbank Risk Management Framework
Brimbank Environmental Sustainability Policy
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 4 of 35
Brimbank Sustainability Framework
Brimbank Environmentally Sustainable Design Framework
Brimbank Economic Development Strategy
Brimbank Social Procurement Policy
1.3. Objectives
The objectives of this Policy are to:
Provide a procurement framework for Council that seeks to achieve best value
for money;
Provide a mechanism for continuous improvement in the provision of services
to the community;
Ensure that Council’s resources are used efficiently and effectively;
Collaborate with other Councils where practical to take advantage of
economies of scale;
Achieve compliance with relevant legislative requirements;
Achieve high standards of probity, transparency, accountability and risk
management;
Provide a framework to achieve ethical behaviour in all procurement;
Prioritise where practical the procurement of environmentally responsible,
locally sourced and socially responsible goods and services; and
Prioritise where practical, procurements which provide social benefit.
1.4. Goods and Services Tax (GST)
All values referred to in the Policy are inclusive of GST.
2. Definitions of terms being used
Term
Definition
The Act
Local Government Act 2020
Best value
Best value in procurement is about selecting the supply of
goods, services and works taking into account both cost and
non-cost factors including:
All services provided by Council must meet the
appropriate quality and costs standards;
Continuous improvement is achieved in the provision of
services;
The need to review services against the best on offer in
both the public and private sectors;
An assessment of value for money in service delivery;
Community expectations and values;
The balance of affordability and accessibility of services to
the community;
Opportunities for local employment growth or retention;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 5 of 35
The value of collaboration with other Councils or public
bodies;
Potential environmental advantages for the municipality;
Contribution to the advancement of Council’s priorities;
Non-cost factors such as fit for purpose, quality, services
and support; and
Cost related factors including whole-of-life costs and
transaction costs associated with acquiring, using,
holding, maintaining and disposing of the goods, services
or works.
Commercial in confidence
Information that, if released, may prejudice the business
dealings of a party e.g. prices, discounts, rebates, profits,
methodologies and process information.
Contract management
The process that ensures both parties to a contract fully meet
their respective obligations as efficiently and effectively as
possible, in order to deliver the business and operational
objectives required from the contract and in particular, to
provide value for money.
Corporate Social Responsibility
(CSR)
CSR is about taking positive action to demonstrate the
Council’s commitment to the local community and
environment on which it impacts.
Councillors and Council staff
Councillors, Council staff, temporary employees, contractors
and consultants engaged by Council. The role of Councillors in
the procurement process is to award contracts above the
Chief Executive Officer’s delegation.
Delegation
A power handed down by Council or Chief Executive Officer
(CEO) in an instrument to enable a delegate to act on
Council’s behalf.
Expressions of interest (EOI)
An invitation to submit an EOI for the provision of goods
and/or services generally set out in the overview of
requirements contained in a document. The process is usually
undertaken to test the market and may be a precursor to a
tender process or a request for quotation. EOI is not an offer
or a contract.
e-Procurement
The automation of an organisation’s procurement processes
using web-based applications.
Probity
Probity refers to uprightness, honesty, proper and ethical
conduct, and propriety in dealings. Within local government,
the word “probity” is often used in a general sense to mean
“good process”. A procurement process that conforms to the
expected standards of probity is one in which clear
procedures that are consistent with Council’s policies and
legislative requirements are established, understood and
followed from the outset. These procedures need to consider
the legitimate interests of suppliers and ensure that all
potential suppliers are treated equally.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 6 of 35
Procurement
Procurement is the whole process of acquisition of external
goods, services and works. The process spans the whole life
cycle from initial concept through to the end of the useful life
of an asset (including disposal) or the end of a service
contract.
Preferred Suppliers
Suppliers who are appointed under an approved agreement
subsequent to a competitive procurement process
Public Body
A public body means any government department or
municipal Council or body established for a public purpose by
an Act of the Parliament of Victoria, any other State, or a
Territory of the Commonwealth, or the Commonwealth
Request for quotation (RFQ)
An RFQ is generally an invitation to a specific or closed
supplier market, designed to capture commercial information
and pricing and allows Council to assess suitability and
evaluate responses against a set of predefined requirements.
Request for tender (RFT)
RFT is the process of inviting parties to submit a quotation by
tender using public advertisement, followed by evaluation of
submissions and selection of a successful bidder or tenderer.
Social procurement
Social procurement uses procurement processes and
purchasing power to generate positive social outcomes in
addition to the delivery of efficient goods, services and works.
Sustainability
Activities that meet the needs of the present without
compromising the ability of future generations to meet their
needs.
Thresholds
The value above which a procurement, unless exempt, is
subject to the mandatory procurement processes.
3. Policy principles
3.1. Procurement Principles
Council will apply following fundamental best practice principles to each procurement
activity irrespective of the value or complexity of that procurement:
Value for money
Open and fair competition
Accountability
Risk management
Probity and transparency
3.1.1. Value for money
Council will undertake efficient and effective procurement activities to ensure that
value for money is obtained. The value for money principle will take into account all
relevant costs and benefits of each proposal throughout the procurement cycle.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 7 of 35
Cost factors include whole-of-life costs and transactional costs associated with
acquiring, using, holding, maintaining and disposal of the goods, services or works.
Non-cost factors include fit for purpose, quality, service, support, environmental
impacts and social benefit.
Lowest price is not the sole determinant of value for money. Value for money
purchasing decisions made by Council are made on the whole-of-life cost and non
cost factors including contributing to Council’s strategic directions as set out in the
Brimbank Community Vision 2040.
The strategic directions of the Brimbank Community Vision 2040 align with the triple
bottom line principles around environmental, economic and social sustainability.
Council is committed to reducing any negative social and environmental impacts and
preferential purchasing of products and services that have been produced to ethical
standards which have minimal negative impacts on the environment and human
health.
3.1.2. Open and fair competition
All prospective contractors and suppliers must be afforded an equal opportunity to
tender or quote, and impartiality must be maintained throughout the procurement
process so it can withstand public scrutiny.
All prospective contractors and suppliers must be treated (and be seen to be treated)
fairly in an open and transparent manner with the same access to information about
the procurement to enable them to submit prices/quotations/tenders on the same
basis.
Council must adequately test the market in a consistent manner without any bias, or
perception of bias, so that potential suppliers and the public have confidence in the
outcome.
The commercial interests of existing and potential suppliers must be protected.
Commercial in confidence information received by Council must not be disclosed.
Commercially sensitive information includes information that, if released, may
prejudice the business dealings of a party e.g. prices, discounts, rebates, profits,
methodologies and process information.
3.1.3. Accountability
Council staff are responsible for the actions and decisions they take in relation to
procurement and for the resulting outcomes. Staff are answerable for such activities
through established lines of accountability and delegation, and ultimately to the Chief
Executive Officer (CEO), Council and the community.
Staff must also ensure they provide adequate and reliable advice to Council to allow
it to make sound decisions on procurement matters.
Council maintains consistency in the approach to procurement across the whole
organisation through coherent frameworks, policies and procedures.
All Council staff must be able to account for all procurement decisions made over the
lifecycle of all goods, services and works purchased by Council and provide feedback
on them. All procurement activities are to provide for an audit trail for monitoring
and reporting purposes.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 8 of 35
Council will conduct its procurement activities in a fair, honest and open manner,
demonstrating the highest level of integrity, consistent with the public interest.
The test for adequate accountability is that an independent third party must be able
to clearly see that a process complying with this policy has been followed and that
the process is fair and reasonable.
3.1.4. Risk management
Risk management is to be appropriately applied to all activities within the
procurement lifecycle and are to be planned and carried out in a manner that will
protect and enhance Council’s capability to prevent, withstand and recover from
interruption to the supply of goods, services and works.
The procurement process must ensure that all risks are managed in accordance with
Council’s Risk Management Policy, Risk Management Framework and Risk
Management Guide including occupational health and safety.
3.1.5. Probity and transparency
Council will conduct its procurement activities in a fair, honest and open manner,
demonstrating the highest level of integrity, consistent with the public interest.
Council’s procurement activities shall be performed with integrity and in a manner to
withstand the closest possible scrutiny.
Councillors and Council staff while engaged by Council shall at all times conduct
themselves in ways that are, and are seen to be, ethical and of the highest integrity.
3.2. Ethics and probity
Council’s procurement activities shall be performed with integrity and in a manner to
withstand the closest possible scrutiny.
Councillors and Council staff while engaged by Council shall at all times conduct
themselves in ways that are, and are seen to be, ethical and of the highest integrity
and will:
Treat potential and existing suppliers with equality and fairness;
Use consistent and transparent processes;
Not seek or receive personal gain;
Maintain confidentiality of commercial in confidence information such as
contract prices and other sensitive information;
Present the highest standards of professionalism and probity;
Deal with suppliers and tenderers with the same information and equal
opportunity;
Be able to account for all decisions and provide feedback on them, taking into
account commercial in confidence issues, so that all decisions are understood
and can be subsequently justified;
Ensure their actions embody the principles of sound financial risk
management;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 9 of 35
Never engage in fraudulent activity of any kind;
Comply with all legal and policy requirements;
Comply with Brimbank Employee Code of Conduct;
Comply with Brimbank Councillor Code of Conduct;
Comply with Brimbank Fraud Prevention Policy; and
Comply with Brimbank Acceptance and Declaration of Gifts Policy – Staff
Council staff that are responsible for managing or supervising contracts are
prohibited from performing any works under the contract they are supervising.
Councillors and Council staff belonging to professional organisations shall, in addition
to the obligations detailed in this policy, ensure that they adhere to any code of
ethics or professional standards required by that body.
3.3. Conflict of interest
Councillor and Council staff while engaged by Council must act with integrity and
avoid conflicts of interest, ensuring there is no conflict or incompatibility between
their personal interests, whether pecuniary (i.e. relates to money) or non-pecuniary,
and their Council position/duties. Members of the public need to be confident that
Councillors and Council staff while engaged by Council provide advice and make
decisions free of any conflict of interest. All Council representatives should consider
real, or the likely perception of, conflicts of interest in relation to their duties,
especially where they are providing advice or making a decision.
If a Councillor or Council staff has a conflict of interest that arises through
involvement in any procurement process, the Councillor or Council officer/staff must
disclose this in accordance with Council’s Governance Rules and exclude themselves
from the decision making process in relation to that matter.
Further information regarding conflict of interest can be found in the following
documents:
Brimbank Employee Code of Conduct
Brimbank Councillor Code of Conduct
Council Officer Conflict of Interest Protocol
3.4. Gifts
As a general principle, Councillors and Council staff while engaged by Council must
not directly or indirectly accept or solicit gifts or hospitality from any supplier,
member of the public, organisation or body. The acceptance of gifts or hospitality
may lead to a perception of being influenced and/or a conflict of interest.
All Council staff must comply with Brimbank Acceptance and Declaration of Gifts
Policy – Staff.
3.5. Service Performance Principles
The Procurement Principles will be applied with the Service Performance Principles
outlined in the Act - Division 1, section 106 Service Performance Principles.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 10 of 35
Council must plan and deliver services to the municipal community in accordance
with the following Service Performance Principles.
a) Services should be provided in an equitable manner and be responsive to the
diverse needs of the municipal community;
b) Services should be accessible to the members of the municipal community for
whom the services are intended;
c) Quality and costs standards for services set by the Council should provide
good value to the municipal community;
d) A Council should seek to continuously improve service delivery to the
municipal community in response to performance monitoring;
e) Service delivery must include a fair and effective process for considering and
responding to complaints about service provision.
3.6. Disclosure of information
Commercial in confidence information received by Council must not be disclosed.
Councillors and Council staff while engaged by Council must comply with Councils’
Information Privacy and Health Records Policy and the Privacy and Data Protection
Act 2014.
Council staff are to avoid references to current or proposed contracts in discussion
with acquaintances or outside interests. Discussion with potential suppliers during the
tender/quote evaluation process should not go beyond the extent necessary to
resolve doubt on what is being offered by that supplier and should only be conducted
by the authorised Contract Officer, or other persons approved by the Tender
Evaluation Panel Chair. At no stage should any discussion be entered into which could
have potential contractual implications prior to the contract approval process being
finalised other than authorised pre-contract negotiations.
Procurement activities will be carried out in a way that supports Council staff in
meeting their obligations to ensure information of a commercially sensitive or
confidential nature is obtained, stored, processed, published (where applicable) and
used in accordance with Privacy and Data Protection Act 2014, Freedom Information
Act 1982, Council policies and procedures.
Procedures are in place to receive and manage tender and supplier documentation in
a secure and confidential manner via the e-tendering portal and Council’s records
management system. All tender documents should be held in electronic security
access and should remain secure and confidential until a decision on a tender is made
public.
3.7.
Competition and Consumer Act 2010
compliance
All suppliers are to be treated fairly in an open and transparent manner and have
access to the same information.
Council will comply with the
Competition and Consumer Act 2010
and other
applicable legislation and obligations under competition and consumer legislation in
areas such as:
Restrictive trade practices;
Market sharing, anti-competitive agreements, exclusive dealing and misuse of
market power;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 11 of 35
Inaccurate communication or promotion; and
Unconscionable and unfair business practices.
4. Procurement governance
4.1. Structure
Council will maintain a procurement management responsibility structure and
delegations ensuring accountability, traceability and auditability of all procurement
decisions made over the lifecycle of goods, services and works purchased by Council.
The procurement structure must:
Be flexible enough to purchase the diverse range of material, goods, services
and works required by Council in a timely manner;
Ensure that prospective suppliers and contractors are afforded an equal
opportunity to quote or tender; and
Encourage competition.
4.2. Legislation and policies
Council’s procurement activities shall comply with all related legislation and policies
as outlined in section 1.2 of this Policy.
4.3. Methods of procurement
4.3.1. Council’s standard methods for purchasing goods, services and works are
by the following methods:
Petty cash for reimbursement of legitimate, urgent and operational
business expenses incurred by staff up to $100;
Purchase card for low cost purchases of goods and services in
accordance with Brimbank Purchasing Card Facility Procedure;
Purchase order following a quotation process from suppliers for
works, goods or services that represent best value for money under
directed quotation thresholds;
Under contract following a quotation or public tender process;
Using aggregated purchasing arrangements with other Councils, MAV
Procurement, Procurement Australia, Victorian Government or other
bodies;
Other arrangements authorised by the Council or the CEO on a
needs basis as required by abnormal circumstances such as
emergencies.
Other arrangements authorised by the Municipal Emergency
Resource Officer in the event of a municipal emergency response.
4.3.2. Council, at its discretion and based on the complexity and cost of the
project, may conduct one-stage or multi-stage tenders.
4.3.3. An EOI may be appropriate where:
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 12 of 35
The requirement is complex, difficult to define, unknown or unclear;
The requirement is capable of several technical solutions;
It is necessary to pre-qualify suppliers and goods to meet defined
standards; or
The requirement is generally known but there is still considerable
analysis, evaluation and/or clarification required both on the
objective and/or the solution.
4.3.4. Collaborative procurement
Council’s procurement activities should consider opportunities to collaborate with
other Council or public bodies for achieving best outcomes for Councils. Council
Officers should connect with other Councils or public bodies when the requirements
are at the planning stage providing enough time to collaborate the procurement
activities.
Any report to Council that recommends entering into a procurement agreement to
include information in relation to any opportunities for collaboration with other
Council or Public Bodies which may be available.
Collaborative Procurement aims to deliver value for money by:
Combining procurement activities, such as tendering, with other councils,
generally those close to Council’s borders;
Combining purchasing power;
Combining procurement administration;
Creating greater efficiencies for contract outcomes and delivery;
Combining Evaluation Team members providing several sources of knowledge
and experience;
Allowing the ability for individual councils to use their own evaluation criteria
and methodology to achieve local value for money outcomes; and
Allowing the ability to award panel contracts over several Council areas.
4.3.5. All procurement methods must be undertaken in accordance with the
appropriate procedures as outlined in section 1.2 of this Policy.
4.3.6. All purchased goods and services must be supported by a purchase order
raised via Council’s financial purchasing module in the finance system.
However, for practical purposes some transactions are exceptions to the
raising of purchase orders. These are:
Petty cash reimbursement
Purchasing card statement payment
Statutory authority payments
Utility payments
Rate refunds and other refunds
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 13 of 35
Security bonds
Insurance claims
Grants
Donations
Councillors and staff reimbursements
All transactions without a purchase order must be approved by the
appropriate delegate in accordance with Council’s instrument of
delegation.
4.4. Responsible financial management
The principle of responsible financial management shall be applied to all procurement
activities including variations to contracts.
The availability of existing funds within an approved budget, or source of funds, shall
be established prior to the commencement of any procurement activity.
Council staff must not authorise the expenditure of funds in excess of their financial
delegations.
Council funds must be used efficiently and effectively to procure goods, services and
works and every attempt must be made to contain the costs of the procurement
process without compromising any procurement principles set out in this Policy.
4.5. Delegations of authority
Delegations of authority define the limitations within which Council staff are
permitted to work. This enables Council to conduct procurement activities in an
efficient and timely manner whilst maintaining transparency and integrity.
Procurement and financial delegations ensure accountability and provide confidence
to Council and the public that procurement activities are dealt with at the appropriate
level.
Brimbank City Council Instruments of Delegations and Financial Authority Limits
outline Council’s delegations of authority.
4.6. Probity auditor or advisor
In certain circumstances a probity auditor or advisor may be considered and
appointed by a Director or the CEO to be part of a tender. These circumstances
include:
Where the integrity of the process may be called into question;
Where a project is technically complex or departs from standard contractual
and legal obligations;
Where the activity is politically sensitive and/or potentially controversial,
which may include protecting the reputation of Council;
To avoid a perception of bias or favouritism;
Where there is substantial government funding involved; or
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 14 of 35
Where the project is of a substantial value generally considered to be over the
value of $5 million and the CEO or a Director has recommended the
appointment of a probity auditor or advisor.
5. Procurement thresholds, processes and procedures
Total Purchase Value
Procurement Action
Procurement Requirement
Up to $5,000
Minimum of one verbal quote
sought.
Evidential material must be
provided to establish the
appropriate number of quotes
has been sought.
Purchasing card or purchase
order to be raised at time of
ordering.
$5,001 to $20,000
Minimum of one written quote
sought.
Evidential material must be
provided to establish the
appropriate number of quotes
has been sought.
Brief description of
requirement.
Purchasing card or purchase
order to be raised at time of
ordering.
$20,001 to $50,000
Minimum of two written quotes
sought.
Evidential material must be
provided to establish the
appropriate number of quotes
has been sought.
Written brief or specification to
selected suppliers is to be
issued.
Purchase order to be raised at
time of ordering with
documentation attached to the
purchase order via the
Procurement portal.
$50,001 to $75,000
Minimum three written quotes
sought.
Evidential material must be
provided to establish the
appropriate number of quotes
has been sought.
Written specification to selected
suppliers is to be issued.
Purchase order must be raised
and approved by the
appropriate financial delegate.
$75,001 to $249,999 (good &
services)
$75,001 to $349,999 (works)
Minimum three written quotes
sought.
Evidential material must be
provided to establish the
appropriate number of quotes
has been sought.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 15 of 35
Total Purchase Value
Procurement Action
Procurement Requirement
Written specification to selected
suppliers is to be issued.
RFQ process via Council’s e
tendering portal.
Responses to be lodged via
Council’s e-tendering portal.
Must be evaluated against
evaluation criteria and
documented on contract file.
Purchases >$100,000 a report
seeking approval must be made
in line with the instrument of
delegation.
Purchase order must be raised
and approved by the
appropriate financial delegate.
$250,000 plus (goods and
services)
$350,000 plus (works)
Public tender process or eligible
panel contracts.
Undertaken in accordance with
Council’s tendering process.
Approval is for total value of
contract including extensions
and known variations.
In some cases, contract
variations as outlined in section
5.5 of this Policy.
Aggregated spend with one
supplier as outlined in section
5.6 of this Policy.
5.1. Procurement thresholds guidelines
5.1.1. All procurement methods must be undertaken in accordance with the
appropriate legislation and procedures as outlined in section 1.2 of this
Policy.
5.1.2. For purchases below the tender threshold, a Director or the CEO may
consider the nature of requirements and the characteristics of the market
are such that a public tender process would lead to a better result for
Council. In these circumstances public tenders will be called for goods,
services or works for which the total expenditure is below the standard
procurement threshold for a tender process.
5.1.3. A quote value relates to the total purchase order or total payment value,
not a purchase order line item value of goods, services or works.
Purchase orders are not to be split in order to circumvent the requirements
of this Policy or the Act.
Any breaches will be dealt with in accordance with the Brimbank Employee
Code of Conduct.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 16 of 35
5.2. Public tenders
A public tender process must be undertaken if the estimated expenditure/purchase
exceeds the following amounts:
$250,000 for goods and services; and
$350,000 for works.
5.2.1. Consider Tender for Large Value RFQs
For procurements that are above $100,000 but below the public tender threshold,
where a competitive quotation process is not achieving the Procurement Principles
set out in section 3, then a public tender should be considered in order to test the
market.
A public tender process may be used for values less than the stated thresholds
(inclusive GST) for goods, services and for works if deemed of benefit to Council and
produce a better outcome in the context of this Policy.
Under these circumstances a Procurement and Evaluation Plan should be developed
to document and plan the procurement and evaluation process details and approved
by the Director or CEO.
5.2.2. Tender Process
The tender process is a centralised function in that it is facilitated and supported by
the Procurement team.
All public tenders must be undertaken via Council’s e-tendering portal.
All tender processes shall be conducted in accordance with the requirements
of this Policy, associated tender procedures and manuals as outlined in section
1.2 of this Policy and section 108 and 109 of the Act.
All tender processes must be initiated by an advertisement in a newspaper
that has a state-wide distribution at a minimum. Council currently advertises
through “The Age” news media. In addition to advertising on state wide
distributed newspaper, advertisements may be placed:
o
In the local news media that is distributed throughout the municipality;
or
o
In other news media or industry specific publications when there is a
requirement to focus on nationwide market or specific industry sector;
or
o
Council’s social media platforms or printed newsletters.
All tenders will be open for a period of no less than 15 business days unless
otherwise approved by the Chief Executive Officer;
Conduct a pre-tender briefing where applicable;
Evaluations will be conducted in accordance with the methodology set out in
Council’s tender manual and will include a minimum of three voting panel
members; Procurement Staff will be one of the voting panel member; the
composition of such panels will be determined by the respective Project
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 17 of 35
Manager; Tender evaluation panels may include external personnel in order to
provide the technical/professional expertise to the panel;
Tender evaluation criteria and its weightings will be documented and agreed
by all Tender Evaluation Panel members prior to the tender closing date and
time; where applicable, weightings can be applied to sustainable procurement
elements (environment, local economy and social). Criteria to be used for
evaluating tenders shall include but not limited to the following:
o
Technical Capability to deliver
o
Commercial Capacity to deliver
o
Financial offer
o
All legislative and regulatory requirements in relation to occupational
health and safety
o
All required insurance cover
o
Environmental sustainability, social and economic inclusion criteria and
weightings where appropriate
o
Also considered will be the Service Performance Principles as outlined
with the Act, risk of doing business and the undertaking of a financial
risk assessment.
Tender processes will be conducted in accordance with the tender conditions;
The tender process will be robust, systematic, transparent, unbiased and
defensible by documented evidence;
Value management process may be conducted in order to obtain the optimal
solution and commercial arrangements, provided they remain within the
intent and scope of the tender;
All negotiations must be undertaken and exhausted with one tenderer before
beginning with another tenderer; a negotiation plan may be established and
documented for transparency and probity purpose;
Procurement Staff on the evaluation panel, in conjunction with the
chairperson will maintain detailed records of all commercial-in-confidence
negotiations;
Tender evaluation panels will produce a report of their evaluation using the
appropriate prescribed template, accepted by the TEP and approved by the
relevant delegate;
Once a tender has been awarded, a formal written contract will be entered
into between the contractor/supplier and Council before works commence.
5.3. Quotations
For purchases up to $249,999 for goods and services and $349,999 for works,
Council staff must undertake a quotation process.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 18 of 35
The quotation process is generally a decentralised function in that it is the
responsibility of the contract manager and the authorising officer with the financial
delegation to ensure that the correct purchasing process is followed as per the
requirements of this Policy, and associated legislation, procedures and manuals as
outlined in section 1.2 of this Policy.
5.3.1. Up to $5,000 – a minimum of one verbal quote is to be sought. Evidential
material must be provided to establish the appropriate number of quotes
has been sought. Value for money is to be demonstrated.
5.3.2. $5,001 to $20,000 – a minimum of one written quote is to be sought.
Evidential material must be provided to establish the appropriate number of
quotes has been sought. Where only one quote is obtained from invited
suppliers, value for money is to be demonstrated. All documentation is to
be attached to the purchase order via the Procurement portal and saved in
Council’s records management system.
5.3.3. $20,001 - $50,000 – a minimum of two written quotes are to be sought
from suppliers who are considered able to meet the requirements.
Evidential material must be provided to establish the appropriate number of
quotes has been sought. Value for money is to be demonstrated. All
documentation is to be attached to the purchase order via the Procurement
portal and saved in Council’s records management system.
5.3.4. $50,001 - $75,000 - a minimum of three written quotes are to be sought
from suppliers who are considered able to meet the requirements.
Evidential material must be provided to establish the appropriate number of
quotes has been sought. Value for money is to be demonstrated. All
documentation is to be attached to the purchase order via the Procurement
portal and saved in Council’s records management system.
5.3.5. Goods and services $75,001 to $249,999 – a minimum of three written
quotes are to be sought from invited suppliers who are considered able to
meet the requirements of the written specifications. Evidential material
must be provided to establish the appropriate number of quotes has been
sought. The RFQ process is to be followed. All written invitations to quote
and responses are to be lodged via Council’s e-tendering portal. All
responses must be evaluated against the evaluation criteria and
documented on the contract file. For purchases greater than $100,000 a
report seeking approval must be made in line with the instrument of
delegation.
5.3.6. Works $75,001 to $349,999 - a minimum of three written quotes are to be
sought from suppliers who are considered able to meet the requirements as
per the written specifications. Evidential material must be provided to
establish the appropriate number of quotes has been sought. The RFQ
process is to be followed. All written invitations to quote and responses are
to be lodged via Council’s e-tendering portal. All responses must be
evaluated against the evaluation criteria and documented on the contract
file. For purchases greater than $100,000 a report seeking approval must
be made in line with the instrument of delegation.
5.4. Existing contracts, panel contracts and preferred suppliers
Where existing contracts and panel contracts have been established by Council, these
contracts must be used. Seeking goods, services and works from suppliers outside of
these contracts may amount to a breach of contract unless otherwise stated in the
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 19 of 35
contract. When seeking quotations using a panel contract, value for money is to be
demonstrated.
Preferred suppliers that must be used where practicable when sourcing goods,
services or works are from the following:
Annual supply contracts
Aggregated/collaborative contracts
Contracts available from MAV Procurement
Contracts available from Procurement Australia
Contracts available with the State Government
5.5. Contract variations
Contract variations may occur from time to time. The conditions of contract may
prescribe the circumstances in which a variation might arise (for example an
instruction by the superintendent for the contractor to undertake additional work –
known as ‘scope variations’). The method of calculating the value of variations could
also be contained within the conditions of contract.
Variations to contracts can be minimised by developing clear procurement plans and
well-defined specifications.
Caution is to be exercised with contract variations where the:
Variation works were not envisaged in the original contract (they are
inconsistent with the scope of that contract);
Value of the variation exceeds the threshold under this Policy;
Value of works which did not reach the threshold in the original contract (and
was not subject to a public tender process) increases, and takes the total
value over the threshold.
Variations to contracts that constitute material changes to the original scope or
specifications to the original contract need to be assessed to determine if a further
tender needs to be undertaken for the variation or an exemption needs to be
arranged. Assessing whether a new tender/contract is required is to include:
The monetary value of the proposed variation, i.e. the value of the variation in
the context of the procurement thresholds; and
The subject matter of the proposed variation, and whether it is consistent with
the scope of the original contract; and
Value for money principles.
All contract variations that do not require a further procurement activity should be
approved in accordance with the Brimbank City Council Instruments of Delegations
and Financial Authority Limits.
5.6. Aggregated spend with one supplier
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 20 of 35
Over a rolling two year period, there may be occasions where a single supplier has
been engaged by multiple RFQs and the transactional spend is below the public
tender thresholds but the overall aggregated spend is above the tender thresholds of
$250,000 or greater for goods and services and $350,000 or greater for works.
The two year period is determined to commence from the date an obligation to
purchase goods, services or works is first entered into by Council.
In these circumstances, the total spend with that supplier may fall within the
parameters of the tender thresholds and a public tender process must be undertaken
for one contract with that supplier.
5.7. Exemptions from public tender process
5.7.1. Council may enter into a contract without first undertaking a public tender
within the usual procurement thresholds under prescribed circumstances.
These circumstances are:
Where Council has resolved that the contract must be entered into
because of an emergency in view of public health security or safety
because of an unforeseen event or occurrence (for example a bush
fire); or
Where the contract is entered into with Council or another approved
group acting as the agent for a group of councils to run the tender on
their behalf and Council has otherwise complied with the Act; or
Where the contract is entered into and satisfies the tests of achieving
value for money, transparency and accountability, by using:
o
State purchase contracts;
o
Whole of Victorian Government contracts;
o
Construction Supplier Register;
o
Agency contracts such as Procurement Australia and MAV
Procurement; or
Where the contract entered into is a novated contract, but the original
contract has undergone a public tender process; or
For the acquisition of Legal Services, however the process of engaging
legal services should still meet the tests of achieving value for money,
transparency and accountability; or
Where the contract entered into is mandated by the Victorian State
Government including, but not limited to the following:
o
Utility providers;
o
Regulatory Authorities;
o
Funding Agreements where a list of suppliers is specified;
o
Australia Post; or
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 21 of 35
Subscriptions must be reviewed annually for sustained value and
continued suitability for purpose
Software application licences must be reviewed at least every 5 years
for sustained value and continued fit for purpose.
An exemption to tender procurement levels and procedures may be
requested subject to approval by appropriate delegate under the following
circumstances:
For additional delivery of works, goods and services that are
intended either as replacement parts, extensions or continuing
services for existing equipment;
Installations where a change in supplier would necessitate the
procurement of goods and services that do not meet the
requirements for interoperability or interchangeability;
Insurance claim due to damages or thefts requiring immediate
actions;
Repair works due to damages caused by third parties, for projects
which are under defects liability period, in which case the contractor
who worked on the project may be used to carry out the works;
An absence of competition for technical reasons.
5.7.2. Tender exemption approval
Exemption requests to the public tender process must be outlined in a
Tender Exemption Report to the CEO for approval.
All exemption reports to the CEO must include:
The proposed contract details;
Details of the current contract arrangements;
A detailed report of competitive market analysis;
Demonstrated best value for money;
Endorsement by the relevant financial delegate of the Business
Unit/Department seeking the exemption (e.g. Director).
All procurements made under an exemption should be based on Council’s
standard terms and conditions, appropriate to the goods, services or works
and established in advance of any commitment being made with a supplier.
Appropriate legislative and regulatory requirements in relation to
occupational health and safety, insurance and indemnity are also required.
All approved tender exemptions will be reported to the Audit and Risk
Management Committee and Council.
Any breaches will be dealt with in accordance with the Brimbank Employee
Code of Conduct.
5.7.3. Exemptions below public tender thresholds
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 22 of 35
An exemption to procurement threshold levels and procedures may be
requested subject to approval by appropriate delegate under the
circumstances outlined in section 5.7.1.
Exemption requests to the procurement threshold requirements must be
outlined in a Procurement Exemption Report to the appropriate delegate for
approval.
5.8. Agency Contracts
Agency Contracts are formed by approved agencies on behalf of a group of Councils,
where a public tender process has been undertaken for the engagement of suppliers
and entered into a contract with the suppliers.
When Council engages a supplier under these arrangements, the services will be
provided under the agreed conditions of contract executed between that supplier and
the relevant Agency.
To ensure that Council meets its obligations in relation the value for money, Council’s
procurement threshold requirements are to be followed with the appropriate amount
of quotations being from suppliers on the Agency contracts, pertaining to specific
scope of Council’s project. A report detailing the process needs to be approved by the
relevant financial delegate.
To capture all expenditure via these Agency arrangements, a contract number will be
generated for each service provided to council. The Procurement Team will assist
with this requirement.
Examples of approved agencies are:
Municipal Association Victoria (MAV)
Procurement Australia.
5.9. State Purchase Contract or Whole of Victorian Government Contracts
The State Purchase Contracts (SPC) or Whole of Victoria Government Contracts can
be closed or open contracts formed subsequent to a public tender process or can be a
register of suppliers who submit an expression of interest and are prequalified based
on satisfying certain criteria. When Local Government entities chose to utilise the
opportunity to engage suppliers from these pre-qualified businesses, the
requirements pertaining to the use of the suppliers on the register must be complied.
Construction Supplier Register is a register of construction related suppliers and are
to be used in accordance with the requirements that are set out in the Ministerial
Directions issued by the State government under the
Project Development and
Construction Management Act 1994 (Vic)
.
6. Internal controls
6.1. General
Council maintains a framework of internal controls over the procurement process that
will ensure:
More than one person is involved in and responsible for the end to end
process of a transaction;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 23 of 35
Appropriate authorisations are obtained and documented;
A clearly documented audit trail exists for procurement activities;
Systems are in place for appropriate monitoring and performance
measurement;
Transparency in the procurement process;
Issues of non-compliance are reported to the Executive Management Team;
Regular internal audits are undertaken by Procurement staff, and
The procurement function is part of the ongoing internal audit plan for Council
and findings are presented to the Audit and Risk Committee.
6.2. Technology purchases
All technology purchases must:
Follow the Information Technology Procurement process.
Be approved by the Information Technology Governance Committee
Comply with Council’s Information Security Management Framework.
6.3. Council staff responsibilities
It is the responsibility of all Council staff while engaged by Council to be aware of
their role ensuring the principles of responsible internal controls are maintained in all
procurement activities. For example:
Authorisation of expenditure must not be in excess of financial delegations;
A purchase must not be split into multiple orders for the same supplier to
avoid the authorisation process or procurement thresholds;
Council staff must not authorise expenditure that relates to them personally;
Purchase orders must be generated at the point where the commitment to
purchase has been made not when the invoice is received;
Expenditure must be recorded in timely manner.
Any breaches will be dealt with in accordance with the Brimbank Employee Code of
Conduct.
7. Risk management
Risk management is to be appropriately applied to all activities within the procurement
lifecycle and are to be planned and carried out in a manner that will protect and enhance
Council’s capability to prevent, withstand and recover from interruption to the supply of
goods, services and works.
7.1. Supply by contract
The provision of goods, services and works by contract potentially exposes Council to
risk.
Council will minimise its risk exposure by measures such as:
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 24 of 35
Standardising contracts to include current, relevant clauses;
Requiring security deposits, bank guarantees or retain a percentage of the
contract amount where appropriate;
Referring specifications to relevant experts;
Requiring contractual agreement before allowing commencement of work;
Use of or reference to relevant Australia Standards (or equivalent);
Effectively managing the contract including monitoring and enforcing
performance;
Undertaking of an independent financial assessment;
Undertaking a risk assessment analysis on high value purchases and projects
of a lesser value but of a complex nature; and
Ensuring contract managers are fully trained on an ongoing basis in
appropriate contract management methodologies.
7.2. Contract terms and conditions
All contractual relationships must be documented in writing based on standard terms
and conditions. Accepting a non-standard terms and conditions for high value
contracts should be assessed for its risk by the team managing the contract and
approved by relevant Director.
Where is it not possible, approval must be obtained from the appropriately delegated
Council officer/staff member of Council as per Brimbank City Council Instruments of
Delegations and Financial Authority Limits.
To protect the interests of Council, terms and conditions must be settled in advance
of any commitment being made with a supplier. Any exceptions to this expose
Council to risk and thus must be authorised by the appropriately delegated Council
officer/staff member of Council as per Brimbank City Council Instruments of
Delegations and Financial Authority Limits.
7.3. Dispute resolution
All Council contracts shall incorporate dispute management and alternative dispute
resolution provisions to minimise the chance of disputes getting out of hand and
leading to legal action.
7.4. Contract management
The purpose of contract management is to ensure that Council, and where applicable
its clients, receive the goods, services or works provided to the required standard of
quality and quantity as intended by the contract and to ensure that all parties meet
their responsibilities and obligations under the contract terms and conditions. This is
achieved by:
Establishing a system of monitoring and achieving the responsibilities and
obligations of both parties’ under the contract;
Notes, written correspondence and contract reviews being recorded on the
contract file;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 25 of 35
Providing a means for the early recognition of issues and performance
problems and the identification of solutions; and
Adhering to the:
o
Brimbank Risk Management Policy;
o
Brimbank Risk Management Framework;
o
Brimbank’s Occupational Health and Safety Policies and Procedures;
and
o
Brimbank Contract Management Manual.
All Council contracts are to include contract management requirements. Furthermore,
contracts are to be proactively managed by the contract manager responsible for the
delivery of the contracted goods, services or works to ensure that Council receives
value for money.
7.5. Tender documentation
Council will ensure that tender documentation is written in a clear and concise
manner and describes all requirements to successfully deliver the objectives and
value to Council. This includes, but is not limited to, defining the scope of works,
performance requirements, insurance/indemnity obligations, occupational, health and
safety requirements and evaluation criteria. Refer to the Brimbank Tendering Manual.
7.6. Evaluation requirements for tenders
The aim of the evaluation process is to select a tender that offers value for money to
Council while ensuring that all respondents are treated in a fair, equitable and
impartial manner. Tendering conditions are outlined in the invitation to tender
documentation.
Council will ensure that the evaluation of tenders is undertaken on a systematic basis
using selection criteria identified in the tender documentation. The Tender Evaluation
Panel (TEP) members and criteria are determined prior to issuing the tender
documents and includes the weighting, or priority given to each tender agreed by the
TEP members. The evaluation criteria should be weighted according to the specific
procurement requirements including all legislative and regulatory requirements in
relation to occupational health and safety. Where applicable, the criteria could include
social procurement outcomes.
7.7. Insurances
Successful tenderers must take out and maintain insurance cover for the term of the
contract and any additional period specified within the contract. Evidence of
insurance coverage must be provided prior to receipt of goods or services and prior
to commencing works under contract. The insurance policies do not contain policy
exclusions that are relevant to the contract.
7.8. Occupational, health and safety
All contractors, suppliers and service providers must comply with all legislative and
regulatory requirements in relation to occupational health and safety. This is a
mandatory requirement and non-compliance will disqualify prospective contractors,
suppliers and service providers from procurement activities with Council.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 26 of 35
7.9. Tender feedback
Council will offer each tenderer general feedback on their specific tender bid but not
on any other tender bid.
Specific evaluation score information may be obtained by making a Freedom of
Information request to Council.
8. E-Procurement
E-Procurement is integral to the overall development of procurement processes and involves
the use of an electronic system/s to acquire and pay for supplies, services or works.
By utilising e-procurement Council aims to:
Reduce transaction costs;
Achieve greater leverage;
Make processes more efficient;
Improve management information and visibility of spend;
Increase control and consistency of processes; and
Improve spend compliance.
9. Demonstrated sustained value
9.1. Integration with Brimbank Community Vision 2040
The Brimbank Community Vision 2040 outlines the Council’s vision for Brimbank as
having a healthy and safe community and be united through a sense of belonging
and pride by 2040; the city be inclusive, resilient, innovative and vibrant and people
share equally in the city’s prosperity and opportunity; the environment be protected
and enhanced and Brimbank’s diverse neighbourhoods and housing offer something
for everyone.
The strategic direction to achieve the vision are provided under three themes. These
are:
1. People
The community to be healthy and active
Services and facilities are responsive to community need
Brimbank is a vibrant and recognised cultural capital
The community feels safe and free from harm
2. Place
All modes of transport are well connected and accessible
Public spaces showcase quality urban design, are accessible to all and are
clean and well maintained
The community will live sustainably and engage with a healthy and protected
natural environment
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 27 of 35
3. Prosperity
Everyone has access to education, training and life-long learning to support
their learning and employment aspirations
Brimbank is a major hub for employment, innovation and investment
Housing meets the needs of different people in the Brimbank community
Council’s procurement strategy shall support the Brimbank Community Vision
including but not limited to those related to sustainability, protection of the
environment, corporate social responsibility and meeting the needs of the local
community.
9.2. Achieving value for money
9.2.1. Requirement
The principle of responsible financial management will be applied to all procurement
activities.
Council’s procurement activities will be carried out on the basis of obtaining value for
money.
This means the total cost of ownership over the lifetime of the requirement is
consistent with acceptable quality, reliability and delivery considerations. Lowest
price is not the sole determinant of value for money.
This will be facilitated by:
Developing, implementing and managing procurement strategies that support
the coordination and streamlining of activities throughout the lifecycle;
Effective use of competition;
Greater emphasis placed on the procurement planning process to use
aggregated contracts where appropriate;
Identifying and rectifying inefficiencies in procurement processes;
Developing cost efficient tender processes including appropriate use of e
solutions;
Council staff responsible for providing procurement services or assistance
within the Council providing competent advice in terms of available products
and agreements; and
Working with suppliers to create relationships that are professional and
productive, and are appropriate to the value and importance of the goods,
services and works being acquired.
9.3. Role of specifications
Specifications used in quotations, tenders and contracts are to support and contribute
to Council’s value for money objectives by:
Ensuring impartiality and objectivity;
Encouraging the use of standard products;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 28 of 35
Encouraging sustainability, local businesses and social outcomes; and
Eliminating unnecessarily stringent requirements.
9.4. Performance measures and continuous improvement
Appropriate performance measures and reporting systems are to be established and
used to monitor performance and compliance with procurement policies, procedures
and controls.
Performance measures developed are to be used to:
Evaluate contractor performance;
Evaluate compliance with procurement policies, procedures and controls;
Evaluate opportunities to improve processes;
Incorporate process improvements; and
Determine if all contractual obligations are successfully met.
Non-compliance of procurement, policies, procedures and controls will be reported on
a regular basis to the Executive Management Team by the Manager Business
Support.
Any breaches will be dealt with in accordance with the Brimbank Employee Code of
Conduct.
9.5. Corporate Social Responsibility (CSR)
CSR is about taking positive action to demonstrate Council’s commitment to the local
community and environment.
Council recognises that it’s purchasing activities, buying power and supply chain has
a material impact on the municipality. To deliver on the Brimbank Community Vision
2040 and its 10 Strategic Directions, Council should use procurement as an
opportunity to generate environmental, economic and social benefits beyond the
procurement activity.
In the procurement process, Council will consider the following:
Environmental sustainability
Economic sustainability
Social sustainability
Council should consider the above factors in all purchases through direct or indirect
procurement processes and may allocate a weighting in a public tender evaluation
criteria having regard to the nature and value of the purchase/contract of up to 10%
9.5.1. Environmentally Sustainable Procurement
The Brimbank Community Vision 2040 aims to transition to a low carbon economy
and adapt to the impacts of climate change. It is committed to provide an
environment to the community that is protected and enhanced so that the
community will live sustainably and engage with a healthy and protected natural
environment.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 29 of 35
‘Sustainability’ means our actions meet current needs without compromising the
prospects of future generations. In achieving this, Council will incorporate
environmental considerations alongside social and economic values in our decision
making processes and support our community to become sustainability stewards.
The Brimbank Climate Emergency Plan (the Plan) acknowledges the 21st century as
a period of climate emergency, and that this urgent crisis presents an opportunity for
positive social change.
Under the Plan, Brimbank commits to lead the community towards a target of zero
net greenhouse gas emissions for Council operations by 2030, and for the Brimbank
municipality by 2040, in accordance with the contemporary advice of the United
Nations Intergovernmental Panel on Climate Change.
The Plan commits Council to take account of the Climate Emergency Plan in all
decision making and to position the climate emergency response as the focus of
organisational strategic coordination until the emergency is declared ended.
The Plan outlines that Council will explore ways for procurement activities to
contribute to the circular economy, and to connected issues such as social
procurement. The circular economy is about recognising that the goods and services
we use have a big environmental impact, and so we need to choose wisely, design
out waste and pollution, keep products and materials in use, and regenerate natural
systems. The Plan has a number of immediate, short-term and ongoing actions to
support the development of a circular economy.
Council is also committed to delivering economic, social and environmental benefits
across the facilities that it owns, operates or leases through the Brimbank
Environmentally Sustainable Design Framework, which aims to ensure that
environmentally sustainable design (ESD) measures are consistently incorporated
into the construction and management of Council buildings and facilities.
The procurement process will:
Include reference to Council’s ESD Framework in tendering and quotation
design and construction templates;
Ensure the evaluation criteria includes ESD for design and construction; and
Ensure the evaluation panel allocates a weighting for ESD.
Contract managers should engage with relevant Departments, where possible, in
relation to achieving the following Environmentally Sustainable objectives as part of
their procurement processes:
Reduce greenhouse gas emissions
Promote a circular economy
Minimising waste production
Reduce water consumption and activities that impact biodiversity
9.5.2. Economic sustainability
The Brimbank Community Vision 2040 provides Strategic directions for a Prosperous
Community which includes improving the local economy by making Brimbank as a
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 30 of 35
major hub for employment, innovation and investment. Council is commitment to
providing local employment and business development opportunities through
facilitation, promotion and advocacy to ensure increased and appropriate industrial,
commercial and residential development.
Economic development is about improving the Brimbank community’s economic
wellbeing and quality of life. Council has a significant role in continuing to facilitate
Brimbank’s sustainable growth and development.
As the economic hub of Melbourne’s west, Brimbank will be characterised by
dynamic, competitive and innovative businesses; accessibility and connectivity;
economic and social participation and wellbeing; vibrant places and high quality
development; environmental resilience; and leadership, collaboration and
partnerships.
One of the most effective ways of growing the local economy is to strengthen and
build the capacity of existing businesses.
Economic sustainable procurement can support the growth of the local economy
through the use of local services and suppliers, and promote local employment
opportunities.
The procurement process will support the use of local services and suppliers, and
promote local employment opportunities.
9.5.3. Social sustainability
The Brimbank Community Vision 2040 aims to achieve a city that will be inclusive,
resilient, innovative and vibrant and our people share equally in the City’s prosperity
and opportunity. Every decision we make and every dollar we spend is with the aim
of continually improving the lives of the people who live in our city. In our decision
making and delivery of Council business we will place our community first.
Council is committed to the goal of a Prosperous Community. It has a strong
commitment to the principles of access, equity, community participation and human
rights, and aims to create a more just society where difference does not lead to
disadvantage. It believes in an ‘equity approach’ at a structural, community and
individual level, which in some cases allows for preferential, additional or targeted
support to ensure everyone receives fair and balanced access to services, facilities
and opportunities.
The Brimbank Social Justice Charter outlines Council’s intent to increase
opportunities for the most disadvantaged groups in our community to access services
and participate in community life.
Council recognises that there are a wide range of barriers that need to be addressed
to achieve social justice for all. These barriers disproportionally affect certain
individuals and groups in our community and Council is committed to integrating the
principles of social justice into all of its policies, plans and procedures.
Social procurement generates positive outcomes by building on initiatives already
undertaken by Council to enhance sustainable and strategic procurement practice. It
further enables Council’s procurement practices to effectively contribute towards
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 31 of 35
building stronger communities and meeting its social objectives particularly for social
inclusion, employment and training, and developing the local economy.
Contract managers, should engage with relevant Departments, where possible to
achieve the following Social Procurement objectives as part of their procurement
processes:
Opportunities for young people (aged 15-25) experiencing barriers
Opportunities for disadvantaged people
Opportunities for Aboriginal & Torres Strait Islander People
Opportunities for people with a disability
Improve gender equity
10. Apply a consistent and standard approach
Council will provide effective and efficient commercial arrangements for the acquisition of
goods and services.
10.1. Standard processes
Council will provide effective commercial arrangements covering standard products
and provision of standard services across Council to enable employees to source
requirements in an efficient manner.
This will be achieved via establishing the following:
Pricing where relevant;
Processes, procedures and techniques;
Tools and business systems (e.g. implementing appropriate e-tendering, e
evaluation, e-catalogue or e-sourcing arrangements);
Reporting requirements; and
Application of standard contract terms and conditions.
10.2. Management information
Council seeks to improve its performance by capturing and analysing procurement
management information in a variety of areas including:
Volume of spend;
Number of transactions per supplier;
Compliance;
Supplier performance
Risk;
User satisfaction; and
Category management.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 32 of 35
11. Strategic procurement and supplier management
Council recognises that in order to achieve sustainable value, a strategic assessment of the
appropriate ‘channel to market’ should be undertaken – whether to go to market on its own,
participate in regional or sector aggregated project or panels, access State Government
panel agreements or other means.
11.1. Developing and managing suppliers
Council recognises the importance of effective and open working relationships with its
suppliers and is committed to the following:
Managing existing suppliers via the appropriate development programs and
performance measures to ensure the benefits are delivered;
Maintaining approved supplier lists; and
Developing new suppliers and improving the capability of existing suppliers
where appropriate.
12.Staff training and development
B-train module has been developed to train employees who have responsibility for
procurement. In addition, Purchasing system and Contracts System training is provided on
needs basis when users are added to the system.
Council staff while engaged by Council who have budgetary, purchasing and contract
management responsibilities are trained and provided with relevant and up to date
information.
In order to ensure statutory requirements and the requirements of this Policy are adhered
to, Council will:
Conduct training for delegated and other new officers commencing at Council;
Provide a copy of this Policy, associated procedures and guidelines to new officers;
Conduct refresher training for all delegated and responsible Council staff throughout
each financial year; and
Communicate as required all new and updated procedures, forms, templates,
standards and documentation.
13.
Local Government Act 2020
Compliance Statement
Section 9(1) of the
Local Government Act 2020
(Act) requires Council to give effect to the
overarching governance principles, in the performance of its role. Section 9(2) of the Act
specifies the governance principles as follows:
a. Council decisions are to be made and actions taken in accordance with the relevant law
(Compliance with the law)
;
b. Priority is to be given to achieving the best outcomes for the municipal community,
including future generations
(Achieve best outcomes for the community)
;
c. The economic, social and environmental sustainability of the municipal district, including
mitigation and planning for climate change risks, is to be promoted
(Promote the
sustainability of the municipality)
;
d. The municipal community is to be engaged in strategic planning and strategic decision
making
(Engage the community in strategic planning and decision making)
;
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 33 of 35
e. Innovation and continuous improvement is to be pursued
(Strive for innovation and
continuous improvement)
;
f. Collaboration with other Councils and Governments and statutory bodies is to be sought
(Collaborate with all other levels of government and government agencies)
;
g. The ongoing financial viability of the Council is to be ensured
(Secure the ongoing
financial viability of Council)
;
h. Regional, state and national plans and policies are to be taken into to account in
strategic planning and decision making
(Strategic planning and decision making
must take into account plans and policies in operation at all levels)
;
i. The transparency of Council decisions, actions and information is to be ensured
(Council
decisions, actions and information must be transparent).
In developing the Procurement Policy, Council has considered and given effect to the
overarching governance principles, as summarised below:
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 34 of 35
Governance Principle
Considerations
(a) Compliance with the law
This Policy is developed to comply with
sections 108 and 109 of the Local
Government Act 2020
(b) Achieve best outcomes for the community This Policy recognises that Council’s
purchasing activities has a material impact on
the municipality and procurement is an
opportunity to generate social, economic and
environmental benefits beyond he
procurement activity.
(c) Promote the sustainability of the municipality This Policy is aligned with the objectives of
Council’s Climate Emergency Plan and
Environmentally Sustainable Design
Framework, which aims to ensure that
environmentally sustainable design measures
are consistently incorporated into the
construction and management of Council
buildings and facilities.
(d) Engage the community in strategic planning
and decision making
Not applicable for the Policy.
(e) Strive for innovation and continuous
improvement
This Policy acknowledges that continuous
improvement practices for identifying and
implementing initiatives to reduce cost and
complexity, improve productivity and buyer
convenience are a key element of
procurement best practice.
(f)
Collaborate with all other levels of
government and government agencies
This Policy requires that contracting,
purchasing and contract management
activities use strategic procurement practices
and innovative procurement solutions to
promote sustainability and best value, in
particular making use of collaboration and
partnership opportunities.
(g) Secure the ongoing financial viability of
Council
This Policy requires Council to undertake
efficient and effective procurement activities
to ensure that value for money is obtained.
The value for money principle will take into
account all relevant costs and benefits of
each proposal throughout the procurement
cycle.
(h) Strategic planning and decision making must
take into account plans and policies in
operation at all levels
This Policy supports the Community Vision,
Council Plan and all other strategic plans and
policies as outlined in section 1.2.
Procurement Policy 2021
Business Support - Procurement
21/415231 – Page 35 of 35
(i)
Council decisions, actions and information
must be transparent
This Policy outlines that Council maintains
consistency in the approach to procurement
across the whole organisation through
coherent frameworks, policies and
procedures. The test for adequate
accountability is that an independent third
party must be able to clearly see that a
process complying with this policy has been
followed and that the process is fair and
reasonable.
All Council staff must be able to account for
all procurement decisions made over the
lifecycle of all goods, services and works
purchased by Council and provide feedback
on them. All procurement activities are to
provide for an audit trail for monitoring and
reporting purposes.
Council will conduct its procurement activities
in a fair, honest and open manner,
demonstrating the highest level of integrity,
consistent with the public interest.
History of amendment
Rev Review date
Reason for amendment
Next review date
27/10/2007
Select date
A 9/05/2011
Annual review/new format
9/05/2012
B 9/05/2012
Annual review
9/05/2013
B 29/10/2013
Annual review
29/10/2014
B 29/10/2014
Annual review
29/10/2015
C 9/02/2016
Annual Review
9/02/2017
D 21/02/2017
Changes to section 6.2 Quotations
9/02/2018
E 19/06/2018
Annual review/new format
19/06/2019
F 21/05/2019
Annual Review
21/05/2020
G 23/06/2020
Annual Review
23/06/2021
H 31/08/2021
Amendments based on
Local Government Act
2020
30/06/2025
Approved by council:
Date approved by council: xxxxxxxx