10 Year Asset Plan
2022-2032
Version 1.1 | July 2022
Page i
Table of contents
1. Introduction
4
1.1. The purpose of this Asset Plan
4
1.2. Compliance with the Local Government Act 2020
4
1.3. Strategic Context
4
1.4. Integrated Strategic Planning and Reporting Framework
5
1.5. How was this Asset Plan Developed
6
1.5.1. Asset Management Plans
6
1.5.2. Deliberate Community Engagement
6
1.5.3. An integrated 10 Year Asset Plan
6
1.6. The scope of this Asset Plan
7
1.7. Not included in this Asset Plan
7
2. Levels of Service
8
2.1. Unplanned Inspection & Maintenance
8
2.2. Planned Inspection & Maintenance
15
2.2.1. Roads & Footpaths
15
2.2.2. Open Spaces
16
2.2.3. Facilities
17
2.2.4. Stormwater
17
2.3. Condition Inspection
18
2.4. Performance Monitoring
18
2.4.1. Roads & Footpaths
18
2.4.2. Open Spaces
19
2.4.3. Facilities
21
2.4.4. Stormwater
23
3. 10 Year Expenditure Forecast
26
3.1. Asset Maintenance Expenditure
26
3.2. Asset Renewal Expenditure
27
3.3. New Asset Expenditure
28
3.4. Asset Upgrade & Expansion Expenditure
29
3.5. Asset Disposal
30
3.6. Asset Sustainability Ratio
31
4. Plan Improvement and Monitoring
32
4.1. Asset Plan Review
32
4.2. Consultation
32
4.3. Performance Measures
33
4.4. Improvement Action Plan
33
Page ii
Queries in relation to this Asset Plan should be directed to:
In writing: Brimbank City Council
Asset & Property Services Department
Brimbank Community and Civic Centre
301 Hampshire Road
Sunshine, VIC 3020
Phone:
03 9249 4000
Email:
info@brimbank.vic.gov.au
This Asset Plan is also available on Council’s website at www.brimbank.vic.gov.au
Page iii
Document control
Document ID: 22/235537
Rev.
Date
Revision Details
Author Checked Approved
1.0
1 July 2022
Enacted by Council
D Di Martino
AMSC
CWSC
1.1
16 December 2022
Added Table 2.1.17
D Di Martino D Di Martino D Di Martino
Introduction
Page 4
1. Introduction
1.1. The purpose of this Asset Plan
As a requirement under the Local Government Act 2020
(
the
Act)
, this Asset Plan has been
developed to guide and demonstrate Council’s responsible and sustainable management of its
public infrastructure assets and to communicate the strategies and funding required to help
achieve our Council Plan objectives and Community Vision statement.
The purpose of this Asset Plan is to:
•
Improve the transparency around asset value and performance.
•
Better inform the community on the type of assets under Council’s management and control.
•
Better inform the community on the financial impost on managing these assets.
•
Contribute to Council’s long-term objectives, strategic intent, and finances.
•
Improve the efficiency and effectiveness of asset management practices through a more
engaged community and informed council.
•
Better align decisions around service levels and standards, and financial sustainability.
1.2. Compliance with the Local Government Act 2020
The Local Government Act 2020 (the
Act
) requires councils to develop, adopt and keep in force an
Asset Plan in accordance with its deliberative engagement practices.
The scope of an Asset Plan is a period of at least the next 10 financial years.
An Asset Plan must include information about maintenance, renewal, acquisition, expansion,
upgrade, and disposal in relation to each class of infrastructure asset under the control of the
Council.
Under the
Act
, councils are required to adopt an Asset Plan by 30 June 2022. The Asset Plan must
be developed in accordance with Council’s deliberative engagement practices.
1.3. Strategic Context
This Asset Plan is a vital component of the Local Government Integrated Strategic Planning and
Reporting Framework (ISPRF). See Section 1.4.
As such, this Asset Plan is aligned and complements the other Council planning and reporting
documents, including our Council Plan 2021-2025, Brimbank Community Vision 2040, Council
Budget, Annual Report, and Financial Plan.
The integration of this Asset Plan within the ISPRF ensures that public assets inform and respond to
changing community needs and expectations; they remain fit for purpose; and that optimum use is
achieved through appropriate maintenance, renewal, and replacement programs.
Introduction
Page 5
1.4. Integrated Strategic Planning and Reporting Framework
Under the
Act
, there is a focus on ensuring that Council’s strategic planning is more integrated,
transparent, and focused on delivering outcomes for the community.
The Integrated Planning and Reporting Framework (ISPRF) will allow Council and the community to
have better visibility across the various elements of the strategic planning and reporting system. It
ensures a greater understanding of how the things we do today, contribute to achieving our future
Community Vision.
The principles that underpin the ISPRF seek to ensure that as an organisation, we are working
together to align our planning and reporting activities with the outcomes outlined our Council Plan,
Community Vision, and other strategies.
Figure 1.4.1 – The Asset Plan & the Integrated Strategic Planning and Reporting Framework (ISPRF)
Introduction
Page 6
1.5. How was this Asset Plan Developed
1.5.1.
Asset Management Plans
Since 2005, Council has kept in force four (4) Asset Management Plans (AMPs) covering the four
main asset groups, namely roads, buildings, open space, and stormwater; and one (1) Road
Management Plan being a requirement under the
Road Management Act 2004
.
The Levels of Service defined in the previous AMP’s were used to:
•
Inform the community of the level of service offered by public infrastructure.
•
Formulate life cycle asset management strategies to deliver these defined levels of service.
•
Enable the community to assess suitability, affordability and equity of services offered.
•
Provide Council with a measure of the effectiveness of public infrastructure services.
•
Provide Council focus for the development of the asset management strategies.
•
Provide Council with guidance for current and future services to be offered, the method by
which these services are delivered and clear definition of the specific Levels of Service which
Council aims to achieve.
The Levels of Service in the previous AMP’s were based on:
•
Community consultation, community surveys, and community feedback.
•
Strategic and corporate goals.
•
Legislative requirements.
•
Codes of Practice.
•
Regulations, environmental standards, industry and Australian Standards that impact the way
assets are managed.
•
Resource availability and overall financial boundaries.
1.5.2.
Deliberate Community Engagement
As a requirement under the
Act
, the first Asset Plan must be adopted by 30 June 2022 and should
be developed and prepared in accordance with Council’s Community Engagement Policy.
Council officers, in collaboration with a consultant specialising in community engagement, designed
and delivered a series of deliberate community engagement workshops to help inform Council’s 10
Year Asset Plan, with a specific focus on asset maintenance and renewal.
1.5.3.
An integrated 10 Year Asset Plan
This Asset Plan constitutes Council’s first 10 Year Asset Plan. It represents:
•
Council’s current competency in asset management.
•
The integration of Council’s previous four (4) Asset Management Plans.
•
Feedback from Council’s deliberate community engagement process.
•
Council officers’ interpretation of Section 92 of the
Local Government Act 2020
.
As such, this Asset Plan is aligned and complements the other Council planning and reporting
documents, including our Council Plan 2021-2025, Brimbank Community Vision 2040, Council
Budget, Annual Report, and Financial Plan.
Introduction
Page 7
1.6. The scope of this Asset Plan
Infrastructure assets covered by this Asset Plan includes all public infrastructure assets owned
and/or managed by Brimbank City Council, and as catalogued in Council’s Asset Management and
Information System.
Assets covered by this Plan are defined in Table 1.6.1 below:
Asset Class
Facilities
Open Space
Roads & Footpaths Stormwater
Asset Group
Aged & Disability
Arts & Culture
Youth & Family
Community Centre
Sports & Leisure
Heritage Buildings
Libraries
Municipal Offices
Public Toiles
Active
Passive
Specialist
Heritage Gardens
Conservation Areas
Undeveloped Land
Activity Centres
Streetscapes
Trees
Roads
Kerb & Channel
Traffic Signals
Roundabouts
Footpaths
Shared Paths
Car Parks
Bridges & Culverts
Pipes
Pits
GPT’s
Wetlands
Swales / Bio-Swales
Sediment Basins
Dams
Tree Pits
Raingardens
Table 1.6.1 – Assets included in this Asset Plan
Key components covered by this Asset Plan are defined in Table 1.6.2 below:
Section 2
Levels of Service
Section 3
10 Year Expenditure Forecast
Section 4
Improvement & Monitoring
Unplanned Maintenance
Planned Maintenance
Condition Monitoring
Performance Monitoring
Asset Maintenance Expenditure
Asset Renewal Expenditure
New Asset Expenditure
Asset Upgrade Expenditure
Asset Disposal
Asset Sustainability Ratio
Asset Plan Review
Consultation
Performance Measures
Improvement Action Plan
Table 1.6.2 – Key components included in this Asset Plan
1.7. Not included in this Asset Plan
This Asset Plan does not provide details such as:
•
Maintenance & operating procedures.
•
Engineering design standards.
This Asset Plan also does not include:
•
Non-council roads such as highways maintained by the Department of Transport.
•
Parks and land managed by the Department of Environment, Land, Water and Environment, or
other State Government body.
•
Assets below the capitalisation threshold as per Council’s Asset Capitalisation Policy.
This Asset Plan is separate and complimentary to Council’s Road Management Plan 2021. The latter
being a requirement for Council to comply with its specific responsibilities and obligations under the
Road Management Act 2004
.
Levels of Service
Page 8
2. Levels of Service
The Levels of Service developed by Brimbank City Council as outlined in this Asset Plan relate to
community and technical service aspects such as safety, condition, and service reliability. The
Levels of Service are presented as inspection and maintenance standards with corresponding
performance measures.
Inspection and maintenance may be:
•
Unplanned. Refer to Section 2.1.
Inspection and maintenance carried out in response to a complaint, unexpected fault, or
sudden defect.
•
Planned. Refer to Section 2.2.
Inspection and Maintenance carried out as part of a scheduled program to avoid unplanned
asset failure.
•
Condition based. Refer to Section 2.3.
Inspection is carried out to estimate the remaining service life of the asset and plan for future
capital works.
2.1. Unplanned Inspection & Maintenance
Unplanned inspection and maintenance is carried out in response to a complaint or as a result of
sudden failure of the asset that was not anticipated.
An appropriate response could include inspection, provision of warning signs, safety control action,
remedial repairs, or permanent repairs.
The performance measure from the receipt of notification, for various asset classes, are provided in
the following tables. The performance measure will be measured against the time when the issue
was first reported.
BBQ’s
Service
Performance
Measure
Performance
Target
BBQ cleans
5 wd
>85%
BBQ repairs
5 wd
>85%
Table 2.1.1 – Response standards for BBQ assets in working days (wd)
Bins (street litter bins)
Service
Performance
Measure
Performance
Target
Overflowing BCC’s Litter Bins
2 wd
>85%
Table 2.1.2 – Response standards for Bins (street litter bins) in working days (wd)
Levels of Service
Page 9
Bridges and Culverts
Service
Performance
Measure
Performance
Target
Bridge flooding
1 wd
>85%
Damaged bridge rails, fence, signs
1 wd
>95%
Missing bridge rails, fence, signs
1 wd
>95%
Table 2.1.3 – Response standards for Bridges & Culverts in working days (wd)
Conservation Areas
Service
Performance
Measure
Performance
Target
Control of Long Grass
5 wd
>85%
Native Planting
5 wd
>85%
Noxious Weed Control
5 wd
>85%
Rabbit Control
5 wd
>85%
Table 2.1.4 – Response standards for Conservation Areas in working days (wd)
Council Buildings
Service
Performance
Measure
Performance
Target
Air Conditioning / Heating
5 wd
>85%
Auto Roller Door
5 wd
>85%
Carpentry
5 wd
>85%
Electrical
5 wd
>95%
External Lighting
5 wd
>85%
Fire Services
5 wd
>95%
Glazier – Cracked
5 wd
>85%
Glazier – Smashed
5 wd
>95%
Lift Repairs
5 wd
>85%
Locksmith Repairs
5 wd
>85%
Pest Control
5 wd
>85%
Plumbing
5 wd
>85%
Plumbing Gas Leak
1 wd
>95%
Security Repairs
5 wd
>95%
Security System Failure
1 wd
>95%
Swimming Pool Plant Issue
5 wd
>85%
Table 2.1.5 – Response standards for Council Buildings in working days (wd)
Levels of Service
Page 10
Conservation Areas
Service
Performance
Measure
Performance
Target
Blocked Pit / Pipe (sub-arterial)
Blocked Pit / Pipe (collector)
Blocked Pit / Pipe (local access)
1 wd
3 wd
5 wd
>85%
>85%
>85%
Flooding (sub-arterial)
Flooding (collector)
Flooding (local access)
1 wd
3 wd
5 wd
>85%
>85%
>85%
Ground collapse / subsidence (sub-arterial)
Ground collapse / subsidence (collector)
Ground collapse / subsidence (local access)
1 wd
1 wd
2 wd
>95%
>95%
>95%
Missing / collapsed pit lid (sub-arterial)
Missing / collapsed pit lid (collector)
Missing / collapsed pit lid (local access)
1 wd
1 wd
2 wd
>95%
>95%
>95%
Table 2.1.6 – Response standards for Conservation Areas in working days (wd)
Fencing & Bollards
Service
Performance
Measure
Performance
Target
Bollard Damaged / Gate Damaged
1 mth
>85%
Fence Damaged
1 mth
>85%
New bollard – Open Space
3 mth
>85%
New bollard – Road Reserve
9 mth
>85%
Table 2.1.7 – Response standards for Fencing & Bollards in months (mth)
Footpaths & Shared Paths
Service
Performance
Measure
Performance
Target
Damaged Footpath / Shared Path (High Activity)
40 wd
100%
Damaged Footpath / Shared Path (Medium Activity)
20 wd
100%
Damaged Footpath / Shared Path (Low Activity)
5 wd
100%
Table 2.1.8 – Response standards for Footpaths / Shared Paths in working days (wd)
Garden Drain / Swale / Wetland
Service
Performance
Measure
Performance
Target
Dredging of Wetlands
1 mth
>85%
Litter Removal
3 wd
>85%
Re-planting of Native Vegetation
1 mth
>85%
Vegetation Overgrown
5 wd
>85%
Weed Spraying
5 wd
>85%
Table 2.1.9 – Response standards for Garden Drains / Swales / Wetlands in working days (wd)
Levels of Service
Page 11
Graffiti
Service
Performance
Measure
Performance
Target
Graffiti Removal Non-Offensive
5 wd
>85%
Graffiti Removal Offensive
2 wd
>95%
Graffiti Removal on Private Property
3 mth
>85%
Table 2.1.10 – Response standards for Graffiti in working days (wd) / months (mth)
Kerb & Channel
Service
Performance
Measure
Performance
Target
Damaged K&C
20 wd
>85%
Holding Water
5 wd
>85%
Table 2.1.11 – Response standards for Kerb & Channel in working days (wd)
Parks & Reserves
Service
Performance
Measure
Performance
Target
Bobcat Works
5 wd
>85%
Bush / Shrub Pruning
1 mth
>85%
Gate Opening / Closing
1 wd
>85%
Grass Cutting
5 wd
>85%
Irrigation Repairs
5 wd
>85%
Lighting Repairs
5 wd
>85%
Litter Removal
3 wd
>85%
Mulching
1 mth
>85%
Pest Control
10 wd
>85%
Snake Sighting Report
1 wd
>85%
Water / Drinking Fountain Repairs
5 wd
>85%
Water Meter Repairs
5 wd
>85%
Weed Removal
5 wd
>85%
Table 2.1.12 – Response standards for Parks & Reserves in working days (wd) / months (mth)
Playgrounds
Service
Performance
Measure
Performance
Target
Damaged / Broken Play Equipment
1 wd
>85%
Playground Equipment Repairs
5 wd
>85%
Soft fall Clean Up
1 wd
>85%
Soft fall Top Up
5 wd
>85%
Table 2.1.13 – Response standards for Playgrounds in working days (wd)
Levels of Service
Page 12
Roads
Service
Performance
Measure
Performance
Target
Cracks Sealing
5 wd
>85%
Edge Drop to Unsealed Shoulder
10 wd
>85%
Grading / Deformations
10 wd
>85%
Guideposts Missing / Damaged
1 mth
>85%
Line Marking Missing / illegible (sub-arterial)
Line Marking Missing / illegible (collector)
Line Marking Missing / illegible (local access)
10 wd
10 wd
15 wd
100%
100%
100%
Material Blocking Traffic Lane (sub-arterial)
Material Blocking Traffic Lane (collector)
Material Blocking Traffic Lane (local access)
1 wd
1 wd
5 wd
100%
100%
100%
Oil Spills (sub-arterial)
Oil Spills (collector)
Oil Spills (local access)
1 wd
3 wd
5 wd
100%
100%
100%
Ponding of Water (sub-arterial)
Ponding of Water (collector)
Ponding of Water (local access)
1 wd
1 wd
5 wd
100%
100%
100%
Pothole (sub-arterial)
Pothole (collector)
Pothole (local access)
5 wd
5 wd
10 wd
100%
100%
100%
Table 2.1.14 – Response standards for Roads in working days (wd) / months (mth)
Signs
Service
Performance
Measure
Performance
Target
Damaged / Missing – Advisory Sign
5 wd
>85%
Damaged / Missing – Street Sign
5 wd
>85%
Damaged / Missing – Traffic Sign
5 wd
>85%
New Advisory Sign Requests
1 mth
>85%
Table 2.1.15 – Response standards for Signs in working days (wd) / months (mth)
Sportsground
Service
Performance
Measure
Performance
Target
Grass Cutting
5 wd
>85%
Soil Top Up in Sportsgrounds
5 wd
>85%
Sportsground Synthetic Repairs
2 wd
>85%
Table 2.1.16 – Response standards for Sportsgrounds in working days (wd)
Levels of Service
Page 13
Stormwater
Service
Performance
Measure
Performance
Target
Damaged / Missing Pit Lid (High Priority)
1 wd
100%
Damaged / Missing Pit Lid (Medium Priority)
2 wd
100%
Damaged / Missing Pit Lid (Low Priority)
2 wd
100%
Blocked Pit / Pipe (High Priority)
1 wd
>85%
Blocked Pit / Pipe (Medium Priority)
3 wd
>85%
Blocked Pit / Pipe (Low Priority)
5 wd
>85%
Ground Collapse / Subsidence (High Priority)
1 wd
>85%
Ground Collapse / Subsidence (Medium Priority)
2 wd
>85%
Ground Collapse / Subsidence (Low Priority)
2 wd
>85%
Flooding Roadway / Wetland (High Priority)
1 wd
>85%
Flooding Roadway / Wetland (Medium Priority)
3 wd
>85%
Flooding Roadway / Wetland (Low Priority)
5 wd
>85%
Minor Repairs
2 wd
>85%
Table 2.1.17 – Response standards for Stormwater in working days (wd)
Street Furniture
Service
Performance
Measure
Performance
Target
Street Furniture Repairs
1 wd
>85%
Table 2.1.18 – Response standards for Street Furniture in working days (wd)
Street Lighting
Service
Performance
Measure
Performance
Target
Decorative Light Bulb Replace
5 wd
>85%
Street Light Request – New
1 mth
>85%
Street Light Request – Relocate
1 mth
>85%
Table 2.1.19 – Response standards for Street Lighting in working days (wd) / months (mth)
Street Sweeping
Service
Performance
Measure
Performance
Target
Cleaning Litter / Debris
3 wd
>85%
Table 2.1.20 – Response standards for Street Sweeping in working days (wd)
Levels of Service
Page 14
Traffic Lights
Service
Performance
Measure
Performance
Target
Traffic Light Faults
1 wd
>85%
Table 2.1.21 – Response standards for Traffic Lights in working days (wd)
Traffic Transport Investigations
Service
Performance
Measure
Performance
Target
New Bus Stop / Shelter
9 mth
>85%
New Footpath / Pram Crossing
9 mth
>85%
New Guard Rail / Post / Barrier
9 mth
>85%
New Line / Road Marking
9 mth
>85%
New Parking / Disabled Bays
9 mth
>85%
New Pedestrian Fencing
9 mth
>85%
New Road Traffic Sign
9 mth
>85%
New School Crossing
9 mth
>85%
New Traffic Signals
9 mth
>85%
New Traffic Calming & Road Safety
9 mth
>85%
Table 2.1.22 – Response standards for Traffic / Transport Investigation in months (mth)
Trees
Service
Performance
Measure
Performance
Target
Branch clearance uplift
5 wd
>95%
Branch clearance wire
1 wd
>85%
Branch pickup – nature strip
5 wd
>85%
Branch pickup – blocking access
1 wd
>95%
Dead / dying tree
5 wd
>95%
Fallen / split tree – nature strip
10 wd
>85%
Fallen / split tree – blocking access
1 wd
>95%
Overhanging branches (private)
1 mth
>85%
Planting tree (new)
1 mth
>85%
Root damage
5 wd
>85%
Stump removal
5 wd
>85%
Table 2.1.23 – Response standards for Trees in working days (wd) / months (mth)
Levels of Service
Page 15
2.2. Planned Inspection & Maintenance
Planned inspection and maintenance refers to routine maintenance carried out to ensure that the
asset continues to be in good condition and prevent the asset from failing unexpectedly.
An appropriate response could include inspection, provision of warning signs, safety control action,
remedial repairs, or permanent repairs.
The performance is measured against the frequency of planned inspection. These are provided in
the following tables.
2.2.1.
Roads & Footpaths
Road Pavement
Road Assets
Maximum Inspection
Interval
Sub-arterial Roads
6 months
Collector Roads
6 months
Local Access Roads
1 year
Bridges and Major Culverts
Bridges / Major Culverts
Maximum Inspection
Interval
Level 1
2 years
Level 2
3 years
Level 3
As identified by Level 2 inspections
Footpaths and Shared Paths
Footpath Hierarchy
Maximum Inspection
Interval
High Activity
6 months
Medium Activity
2 years
Low Activity
3 years
Open Spaces
3 years
Levels of Service
Page 16
2.2.2.
Open Spaces
Conservation Areas
Conservation Areas
Maximum Inspection
Interval
Grasslands
3 months (seasonal)
Escarpments
3 months (seasonal)
Rocky Outcrops
3 months (seasonal)
Revegetation
3 months (seasonal)
Playgrounds
Playground & Equipment
Maximum Inspection
Interval
Flagship Parks
2 times weekly
Suburban Parks
Fortnightly
Neighbourhood Parks
2 months
Local Parks
2 months
Children Centres
2 months
Passive Open Spaces
Parks & Reserves
Maximum Inspection
Interval
Flagship Park
2 times weekly
Suburban Parks
fortnightly
Neighbourhood Parks
1 month
Local Parks
1 month
Heritage Parks
3 times weekly
Undeveloped Land
5 weekly
Skate Park
Parks & Reserves
Maximum Inspection
Interval
Skate Park
1 month
Levels of Service
Page 17
2.2.3.
Facilities
Facility Component
Maximum Inspection
Interval
Carpentry
12 months
Carpets
12 months
Curtains & Blinds
12 months
Doors
12 months
Electrical
12 months
Essential Safety Measures (ESM)
12 months
Painting
12 months
Paving & Concreting
12 months
Plumbing
12 months
Pumps
12 months
Roof Access
12 months
Roof Clean Downs
12 months
Shelter & Shade Structures
12 months
Steel Fabrication
12 months
2.2.4.
Stormwater
Stormwater Assets
Stormwater Assets
Maximum Inspection
Interval
Litter Basket Pits
5 weeks
GPT
3 months
Swales / Bio-Swales
3 months
Tree Pits
3 months
Raingardens
3 months
Levels of Service
Page 18
2.3. Condition Inspection
Council’s asset condition inspection objective is to:
• Identify those assets which are in a condition that is below the acceptable level or approaching
such a level.
• Predict when asset failure to deliver the agreed level of service is likely to occur.
• Determine what corrective action is required and when it will be required.; and
• Inform Council’s 10 Year Capital Works Program.
Frequency of condition assessment
Asset Class
Maximum Inspection
Interval
Roads & Footpaths
3 years
Open Spaces
3 years
Facilities
3 years
Stormwater
Rolling Annual Program
2.4. Performance Monitoring
This following section of the Asset Plan describes how Council assesses the performance of its
assets.
2.4.1.
Roads & Footpaths
Council’s road and footpath condition assessment techniques have been developed to give
repeatable and objective assessments, and aim to achieve the following strategic goal:
• Ensure community satisfaction with the condition and amenity of the asset; and
• Keep the number of distress parameters within a specified threshold target range, at minimum
whole of life cost.
Road Condition
Condition
Grade Description
Useful Remaining
Life Factor
Action
0
Asset removed or no longer exists.
0
No action required.
1
Excellent. Asset is as new.
≥0.90
Planned maintenance required
2
Good. Asset is functional and displays
superficial defects only.
0.60 < 0.90
Minor maintenance required.
3
Fair. Asset is functional but shows signs
of wear and tear.
0.30 < 0.60
Significant maintenance
required.
4
Poor. Asset has significant defects
affecting major components.
0.10 < 0.30
Significant renewal /
rehabilitation required.
5
Failed. Asset is no longer functional.
<0.10
Asset requires to be
decommissioned or replaced.
Levels of Service
Page 19
Footpath Condition
Condition
Grade
Description
Useful Remaining
Life Factor
Action
0
Asset removed or no longer exists.
0
No action required.
1
Excellent. Asset is as new.
≥0.90
Planned maintenance required
2
Good. Asset is functional and displays
superficial defects only.
0.60 < 0.90
Minor maintenance required.
3
Fair. Asset is functional but shows signs
of wear and tear.
0.30 < 0.60
Significant maintenance
required.
4
Poor. Asset has significant defects
affecting major components.
0.10 < 0.30
Significant renewal /
rehabilitation required.
5
Failed. Asset is no longer functional.
<0.10
Asset requires to be
decommissioned or replaced.
2.4.2.
Open Spaces
Council’s open space condition assessment techniques have been developed to give repeatable and
objectives assessments, and aim to achieve the following strategic goal:
• Ensure community satisfaction with the condition and amenity of the asset; and
• Keep the number of distress parameters within a specified threshold target range, at minimum
whole of life cost.
Open Space Condition
Condition
Grade Description
Useful Remaining
Life Factor
Action
0
Asset removed or no longer exists.
0
No action required.
1
Excellent. Asset is as new.
≥0.90
Planned maintenance required
2
Good. Asset is functional and displays
superficial defects only.
0.60 < 0.90
Minor maintenance required.
3
Fair. Asset is functional but shows signs
of wear and tear.
0.30 < 0.60
Significant maintenance
required.
4
Poor. Asset has significant defects
affecting major components.
0.10 < 0.30
Significant renewal /
rehabilitation required.
5
Failed. Asset is no longer functional.
<0.10
Asset requires to be
decommissioned or replaced.
Open Space Capacity / Utilisation
Capacity
Grade
Description
0
Asset removed or no longer exists.
1
Excellent. Usage corresponds well with design capacity and no operational problems
experienced.
2
Good. Usage is within design capacity and occasional operational problems experienced.
3
Fair. Usage is approaching design capacity and/or operational problems occur frequently.
4
Poor. Usage exceeds or is well below design capacity and/or significant operational problems are
evident.
5
Failed. Exceeds design capacity or is little used and/or operational problems are serious and
ongoing.
Levels of Service
Page 20
Open Space Functionality
Function
Grade
Description
0
Asset removed or no longer exists.
1
Excellent. Meets service delivery needs in a fully efficient and effective manner.
2
Good. Asset meets service delivery needs in an acceptable manner.
3
Fair. Asset meets most service delivery needs and some inefficiencies and ineffectiveness
present.
4
Poor. Limited ability to meet service delivery needs.
5
Failed. Is critically deficient, does not meet service delivery and is neither efficient nor effective.
Levels of Service
Page 21
2.4.3.
Facilities
The following table provides guidance on how to assess the condition grades of building
components. Rather than providing specific guidance on every component, the table provides high
level principles to follow.
Facility Condition
Condition
Grade 1
Condition
Grade 2
Condition
Grade 3
Condition Grade 4 Condition Grade 5
Excellent
Good
Fair
Poor
Failed
Useful
Remaining
Life Factor
>0.55 0.40 ≤ 0.55 0.25 ≤ 0.40
0.10 ≤ 0.25
< 0.10
Structure
Sound
structure
Functionally
sound
structure
Adequate
structure, some
evidence of
foundation
movement, minor
cracking
Structure functioning
but with problems due
to foundation
movement. Some
significant cracking.
Structure has serious
problems and concern is
held for the integrity of
the structure.
External
Walls
Wall cladding
constructed
with sound
materials, true
to line and
level. No
evidence of
deterioration or
discoloration.
Showing
minor wear
and tear and
minor
deterioration
of surfaces.
Appearance
affected by minor
cracking, staining
or minor leakage.
Indications of
breaches of
weatherproofing.
Minor damages to
coatings.
Wall cladding
damaged, weakened
or displaced.
Appearance affected
by cracking, staining,
overflows or
breakages. Breaches
of weatherproofing
evident. Coatings in
need of heavy
maintenance or
renewal.
Wall cladding is badly
damaged or weakened.
Appearance affected by
cracking, staining,
overflows, leakage or
wilful damage. Breaches
of waterproofing.
Coatings badly damaged
or non-existent.
Roof
Cladding
Roof cladding
constructed
with sound
materials
, true
to line and
level. No
evidence of
deterioration or
discoloration.
Roof cladding
minor wear
and tear and
minor
deterioration
of surfaces.
Appearance
affected by minor
cracking, staining
or minor leakage.
Indications of
breaches of
weatherproofing.
Minor damages to
coatings.
Roof cladding
damaged, weakened
or displaced.
Appearance affected
by cracking, staining,
overflows or
breakages. Breaches
of weatherproofing
evident. Coatings in
need of heavy
maintenance or
renewal.
Roof cladding is badly
damaged
or weakened.
Appearance affected by
cracking, staining,
overflows, leakage or
wilful damage. Breaches
of waterproofing.
Coatings badly damaged
or non-existent.
Internal
Fabric
constructed
with sound
materials, true
to line and
level. No
evidence of
deteri
oration or
discoloration.
Showing
minor wear
and tear and
minor
deterioration
of surfaces.
Appearance
affected by minor
cracking, staining
or minor leakage.
Indications of
breaches of
weatherproofing.
Minor damages to
coatings.
Fabric damaged,
weakened or
displaced. Appearance
affected by cracking,
staining, overflows or
breakages. Breaches
of weatherproofing
evident. Coatings in
need of heavy
maintenance or
renewal.
Fabric is badly damaged
or weakened.
Appearance affected by
cracking, staining,
overflows, leakage or
wilful damage. Breaches
of waterproofing.
Coatings badly damaged
or non-existent.
Services
All components
operable and
well maintained
All
components
operable.
Occasional
outages,
breakdowns or
blockages.
Increased
maintenance
required.
Failures of plumbing,
electrical and
mechanical
components common
place.
Plumbing, electrical and
mechanical components
are unsafe or
inoperable.
Fittings
Well secured
and operational,
sound of
function and
appearance.
Operational
and
functional,
minor wear
and tear.
Generally
operational. Minor
breakage.
Fittings of poor quality
and appearance, often
inoperable and
damaged.
Most are inoperable or
damaged.
Levels of Service
Page 22
Facility Capacity / Utilisation
Capacity
Grade
Description
0
Asset removed or no longer exists.
1
Excellent. Usage corresponds well with design capacity and no operational problems
experienced.
2
Good. Usage is within design capacity and occasional operational problems experienced.
3
Fair. Usage is approaching design capacity and/or operational problems occur frequently.
4
Poor. Usage exceeds or is well below design capacity and/or significant operational problems are
evident.
5
Failed. Exceeds design capacity or is little used and/or operational problems are serious and
ongoing.
Facility Functionality
Function
Grade
Description
0
Asset removed or no longer exists.
1
Excellent. Meets program/service delivery needs in a fully efficient and effective manner.
2
Good. Asset meets program/service delivery needs in an acceptable manner.
3
Fair. Asset meets most program/service delivery needs and some inefficiencies and
ineffectiveness present.
4
Poor. Limited ability to meet program/service delivery needs.
5
Failed. Is critically deficient, does not meet program/service delivery and is neither efficient nor
effective.
Levels of Service
Page 23
2.4.4.
Stormwater
Council has currently in place a rolling programme for the data collection, verification, cleansing,
and condition assessment of its stormwater assets. This programme has engaged the services of a
suitably qualified and experienced Contractor for the provision of this work and based on the
standards set out by the Conduit Inspection Reporting Code of Australia WSA05-2013 version 3.1.
This programme is aimed at improving the quality, safety and capacity of Council’s stormwater
network and to help reduce the backlog of our aging drainage infrastructure.
The performance of stormwater assets is assessed based on:
• Structural condition;
• Service condition; and
• Capacity.
The structural grading thresholds are set out in based on the following table below:
Stormwater Condition – Structural
Structural
Grading
Description
Response
1
Insignificant deterioration of
the stormwater drain has
occurred. Appears to be in
good condition.
No immediate action required. Standard programmed condition
assessment.
2
Minor deterioration of the
stormwater drain has
occurred. Minor defects are
present.
No immediate action required. Standard programmed condition
assessment.
3
Moderate deterioration of
the stormwater drain has
occurred. Developed defects
are present but not affecting
short term structural
integrity.
Monitor with programmed condition assessment for rehabilitation
and/or renewal in medium term.
4
Serious deterioration of the
stormwater drain has
occurred. Significant defects
are present affecting
structural integrity.
Take immediate action as appropriate to defects e.g., temporary
supports.
Immediately undertake risk assessment and further investigate
as required.
As appropriate to outcomes of above, schedule appropriate
action which may include rehabilitation and/or renewal in the
short term.
5
Failure of the stormwater
drain has occurred or is
imminent.
Take immediate action as appropriate e.g., temporary support.
Immediately undertake risk assessment and further
investigation, and, as, take appropriate action which may include
immediate rehabilitation and/or renewal.
Levels of Service
Page 24
The service grading thresholds are set out in based on the following table below:
Stormwater Condition – Service
Service
Grading
Description
Response
0
N/a
N/a
1
No or insignificant loss of
hydraulic performance has
occurred. Appears to be in good
condition.
No immediate action required. Standard programmed
condition assessment.
2
Minor defects are present causing
minor loss of hydraulic
performance.
No immediate action required. Standard programmed
condition assessment.
3
Developed defects are present
causing moderate loss of
hydraulic performance.
Monitor with programmed condition assessment for
rehabilitation and/or renewal in medium term.
4
Significant defects are present
causing serious loss of hydraulic
performance.
Take immediate action as appropriate to defects e.g.,
temporary supports.
Immediately undertake risk assessment and further
investigate as required.
As appropriate to outcomes of above, schedule
appropriate action which may include rehabilitation
and/or renewal in the short term.
5
Failure of the stormwater drain
has occurred or is imminent.
Take immediate action as appropriate e.g., temporary
support.
Immediately undertake risk assessment and further
investigation, and, as, take appropriate action which
may include immediate rehabilitation and/or renewal.
Levels of Service
Page 25
The capacity grading thresholds are set out in based on the following table below:
Stormwater Capacity
Capacity
Grade Description
0
Asset removed / no longer exists.
1
Excellent. Usage corresponds well with design capacity and no operational problems
experienced.
2
Good. Usage is within design capacity and occasional operational problems experienced.
3
Fair. Usage is approaching design capacity and/or operational problems occur frequently.
4
Poor. Usage exceeds or is well below design capacity and/or significant operational problems are
evident.
5
Failed. Exceeds design capacity or is little used and/or operational problems are serious and
ongoing.
Stormwater Consequence of Failure Rating
Criteria Category
Point Rating
Land Use
Heritage Registered Sites
20
Central Business District
20
Commercial / Industrial
10
RGZ Residential
8
GRZ Residential
4
NRZ Residential
2
Open Spaces & Parks
1
Asset Location
Roads AADT >5,000
20
Roads AADT >1,000 to ≤5,000
10
Roads AADT ≤1,000
5
Under Buildings
20
No Construction
1
Asset Type
Pipe / Node >900mm diameter
30
Pipe / Node >300mm to ≤900mm diameter
15
Pipe / Node ≤300mm
5
Sump
30
Other
15
Stormwater Criticality Risk
The Risk rating assessment is determined as Consequence Rating x Condition Rating.
Risk Rating
Description
Tacit Knowledge
Critical Risk
>180
High Risk
80 to ≤180
Moderate Risk
<80
Low Risk
10 Year Expenditure Forecast
Page 26
3. 10 Year Expenditure Forecast
This section of the Asset Plan provides financial details of asset expenditure over the next 10 years. The financial information provided is presented as a
series of tables, each table representing one type of expenditure, namely:
•
Asset Maintenance Expenditure.
•
Asset Renewal Expenditure.
•
New Asset Expenditure.
•
Asset Upgrade and Expansion Expenditure.
•
Asset Disposal.
In addition to this, an estimate of the Asset Sustainability Ratio is also provided under Section 3.6 of this Asset Plan.
3.1. Asset Maintenance Expenditure
The following table provides an estimate of future expenditure for the maintenance of existing and future assets over a 10-year period.
Asset Maintenance Costs includes activities such as scheduled maintenance and reactive repairs when needed.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
10 yr. average
Roads
2,436,916 2,436,916 2,436,916 2,436,916 2,436,916 2,436,916 2,436,916 2,436,916 2,436,916 2,436,916
2,436,916
Footpaths
1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000
1,050,000
Open Spaces 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887 10,930,887
10,930,887
Facilities
3,209,980 3,209,980 3,209,980 3,209,980 3,209,980 3,209,980 3,209,980 3,209,980 3,209,980 3,209,980
3,209,980
Stormwater 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979 1,408,979
1,408,979
Total Available 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762 19,036,762
19,036,762
Table 3.1.1 – Estimated expenditure on Asset Maintenance over the next 10 years ($, not-indexed).
10 Year Expenditure Forecast
Page 27
3.2. Asset Renewal Expenditure
Capital renewal on an existing asset is intended to return the service potential or the life of the asset back to its original life. As it reinstates existing
service potential, it has no impact on revenue, but may reduce future operating and maintenance expenditure if completed at the optimum time. Council
undertakes annual renewal programs such as road re-sealing, road re-sheeting, footpath and playground renewal.
Assets for which the condition score is above the intervention level are considered for inclusion in the long-term capital renewal program.
Condition inspection programs are scheduled every 3 years for roads, footpaths, open spaces, and buildings. Stormwater inspection program is carried
out as a rolling program on an annual basis, targeting high risk areas.
Works may also be identified from ad-hoc inspections and customer requests.
The following table provides an estimate of future expenditure for renewing existing assets over a 10-year period.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
10 yr. average
Roads
21,622,765 20,906,517 20,812,584 20,650,407 21,225,000 21,225,000 21,225,000 21,225,000 21,225,000 21,225,000
21,134,227
Footpaths
3,200,000
3,200,000
3,200,000
3,200,000 3,200,000 3,200,000 3,200,000 3,200,000 3,200,000 3,200,000
3,200,000
Open Spaces
1,060,500
1,115,500
1,418,000
1,241,500 1,518,000 1,505,500 1,198,000 1,055,500 1,055,500 1,055,500
1,222,350
Facilities
1,635,833
1,960,833
1,530,833
1,230,833 1,317,500 1,307,500 1,307,500 1,527,500 1,127,500 1,127,500
1,407,333
Stormwater
375,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
127,500
Total Available 27,894,098 27,282,850 27,061,417 26,422,740 27,360,500 27,338,000 27,030,500 27,108,000 26,708,000 26,708,000
27,091,411
Table 3.2.1 – Estimated expenditure on Asset Renewal over the next 10 years ($, not-indexed).
10 Year Expenditure Forecast
Page 28
3.3. New Asset Expenditure
New assets are assets acquired to provide a new service to the community that did not exist previously.
New assets may be gifted, constructed, acquired, or purchased by Council in the following circumstances:
There may be an identified need to construct, acquire or purchase a new asset for municipal purposes. This need may be identified as part of a Study /
Strategy / Policy / Master Plan / or Council Report that has been endorsed by Council resolution.
The following table provides an estimate of future expenditure for new assets over a 10-year period.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
10 yr. average
Roads
3,795,869 2,785,369 4,067,845 3,530,721 3,951,000 3,021,000 3,745,500 3,025,500 3,745,500 3,025,500
3,469,380
Footpaths
2,915,000 2,415,000 1,935,000 1,195,000 1,285,000 835,000 1,085,000 1,085,000
385,000
385,000
1,352,000
Open Spaces
7,938,750 6,846,250 3,073,750 3,830,250 5,973,750 2,571,250 4,433,750 2,556,250 2,256,250 2,256,250
4,173,650
Facilities
4,285,000 3,120,000 1,557,500 5,502,500 2,312,500 3,060,000 6,950,000 11,845,000 6,415,000 5,115,000
5,016,250
Stormwater
550,000
400,000
400,000
1,000,000 1,300,000 400,000
400,000
400,000
400,000
400,000
565,000
Total Available
19,484,619 15,566,619 11,034,095 15,058,471 14,822,250 9,887,250 16,614,250 18,911,750 13,201,750 11,181,750
14,576,280
Table 3.3.1 – Estimated expenditure on New Assets over the next 10 years ($, not-indexed).
10 Year Expenditure Forecast
Page 29
3.4. Asset Upgrade & Expansion Expenditure
Asset Upgrade and Asset Expansion is when an existing asset, one that is already in service, is physically enhanced in a way that can increase its
capacity to provide that service. Examples include increasing the size of an underground stormwater pipe to account for an increase in rainfall, or building
an extension on an existing sports pavilion.
For the purpose of this Asset Plan, existing assets that are upgraded and/or expanded, are recognised as a financial expenditure for Council. The financial
expenditure in this instance is the estimated capital cost to undertake the works as planned.
The following table provides an estimate of future expenditure for the upgrade and expansion of existing assets over a 10-year period.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
10 yr. average
Roads
2,700,053 2,766,803 2,978,017 2,766,081 3,024,000 2,834,000 2,914,500 2,834,500 2,914,500 2,834,500
2,856,695
Footpaths
145,000
145,000
145,000
145,000
145,000
145,000
145,000
145,000
145,000
145,000
145,000
Open Spaces
1,715,750 1,348,250 1,728,250 1,493,250 2,203,250 1,758,250 1,663,250 1,233,250 1,133,250 1,133,250
1,541,000
Facilities
2,949,167 4,839,167 6,461,667 2,341,667 5,290,000 10,987,500 2,947,500 3,262,500 4,612,500 9,512,500
5,320,417
Stormwater
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
Total Available
7,959,970 9,549,220 11,762,933 7,195,998 11,112,250 16,174,750 8,120,250 7,925,250 9,255,250 14,075,250
10,313,112
Table 3.4.1 – Estimated expenditure on Asset Upgrade and Expansion over the next 10 years ($, not-indexed).
10 Year Expenditure Forecast
Page 30
3.5. Asset Disposal
Asset Disposal, sometimes referred to asset decommission, is a process whereby a Council may divest itself of a public asset in an authorised manner as
directed by an adopted Council policy. Asset Disposal could result in a public asset being removed from service such as a road discontinuance; or in the
case of surplus Council land, sold in an open market as per Council’s Sale of Surplus Land Policy 2019.
For the purpose of this Asset Plan, assets that are disposed of are recognised, in accounting terms, as a financial income (surplus) for Council. Value
thresholds have also been established for all asset classes as per Council’s Asset Capitalisation Policy 2017. This is to distinguish between those
expenditures that are capitalised, and those to that are treated as regular maintenance.
The following table provides a forecast of future incomes received for the disposal of public assets over a 10-year period.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
10 yr. average
Roads
0
0
0
0
0
0
0
0
0
0
0
Footpaths
0
0
0
0
0
0
0
0
0
0
0
Open Spaces
0
0
0
0
0
0
0
0
0
0
0
Facilities
0
0
0
0
0
0
0
0
0
0
0
Stormwater
0
0
0
0
0
0
0
0
0
0
0
Total Available
0
0
0
0
0
0
0
0
0
0
0
Table 3.5.1 – Estimated income from Asset Disposal over the next 10 years ($, not-indexed).
As Table 3.5.1 above illustrates, at the time of preparing this 10 Year Asset Plan, Council has made no binding commitment to dispose of any public asset
over the next 10-year period.
10 Year Expenditure Forecast
Page 31
3.6. Asset Sustainability Ratio
The following table provides an estimate of Council’s annual Asset Sustainability Ratio over a 10-year period.
The Asset Sustainability Ratio is a measure of the financial sustainability of public assets. The focus of this measure is to ensure that sufficient funding is
available to maintain existing assets.
This is a simple ratio between “Total Funding Required” and “Total Funding Available” for existing assets only.
When the “Total Funding Available” and “Total Funding Required” are equal in value, the Asset Sustainability Ratio is 1.00, or 100%. This means that
public assets are being replaced as they reach the end of their service life.
The ideal Asset Sustainability Ratio range should be between 0.95 and 1.05. Less than 0.95 and the assets will deteriorate over time. Anything above
1.05 means that the quality of the assets improve over time.
Council’s approach should be to achieve an Asset Sustainability Ratio between 0.95 and 1.05 within the 10 year period of this first Asset Plan, and
maintain it at that level thereafter.
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32 10 yr. average
Roads
19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000 19,995,000
Footpaths
4,560,000 4,560,000 4,560,000 4,560,000 4,560,000 4,560,000 4,560,000 4,560,000 4,560,000 4,560,000
4,560,000
Open Spaces
3,548,000 3,548,000 3,548,000 3,548,000 3,548,000 3,548,000 3,548,000 3,548,000 3,548,000 3,548,000
3,548,000
Facilities
4,704,000 4,704,000 4,704,000 4,704,000 4,704,000 4,704,000 4,704,000 4,704,000 4,704,000 4,704,000
4,704,000
Stormwater
5,736,000 5,736,000 5,736,000 5,736,000 5,736,000 5,736,000 5,736,000 5,736,000 5,736,000 5,736,000
5,736,000
Total Funding Required
38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000 38,543,000
Total Funding Available
27,894,098 27,282,850 27,061,417 26,422,740 27,360,500 27,338,000 27,030,500 27,108,000 26,708,000 26,708,000 27,091,411
Surplus/Deficit
-10,648,902 -11,260,150 -11,481,583 -12,120,260 -11,182,500 -11,205,000 -11,512,500 -11,435,000 -11,835,000 -11,835,000 -11,451,590
Asset Sustainability Ratio
0.72
0.71
0.70
0.69
0.71
0.71
0.70
0.70
0.69
0.69
0.70
Table 3.6.1 – Estimated Asset Sustainability Ratio over the next 10 years ($, not-indexed).
Plan Improvement and Monitoring
Page 32
4. Plan Improvement and Monitoring
This section outlines how Council will measure the performance and effectiveness of this Asset Plan over time.
4.1. Asset Plan Review
This Asset Plan will be reviewed during annual budget preparation and amended to recognise any changes in service levels and/or resources available to
provide those services as a result of the budget decision process.
This Asset Plan is to be revised every year. The revision aims to ensure that this Asset Plan continues to reflect and respond to changing community
priorities, emerging trends, and new developments in asset management.
Monitoring of this Asset Plan is required to ensure compliance with:
•
The improvement plan and timelines.
•
Compliance with the
Local Government Act 2020
.
•
Community Engagement Policy 2021.
4.2. Consultation
In any review associated with this Asset Plan, consultation will be undertaken as follows:
•
Internally by Council’s Asset Management Steering Committee; and
•
Externally as per Council’s Community Engagement Policy 2021.
Plan Improvement and Monitoring
Page 33
4.3. Performance Measures
The effectiveness of this Asset Plan will be measured and monitored on the basis of annual strategic Council indicators as follows:
•
The performance of Council against the Levels of Service documented in this Asset Plan (Section 2). Comparing the ‘performance measure’ against
the ‘performance target’.
•
The degree to which the required cash flows (Section 3.1 to 3.5) identified in this Asset Plan are incorporated into Council’s Long Term Financial Plan,
and Capital Works Program.
•
Performance in achieving an Asset Sustainability Ratio Target is between 0.95 and 1.05 within the 10 year period of this first Asset Plan (Section
3.6).
•
The level of execution of the identified improvement action plan in this Asset Plan (Section 4.4). In most instances, the level of execution will be
measured in changes to the relevant policies, strategies, plans, and guideline documents that Council may have in place, as they relate to each of the
improvement actions.
The timelines identified represent an initial target to measure the level of execution by June 2023 for each improvement action.
However, this Asset Plan notes that the true success of some improvement actions can take longer to be realised in real terms, and others remain a
continual challenge. As such, this Asset Plan intends to measure and report the performance of each improvement action on an ongoing basis after
the initial target, and continue to do so until it the improvement action is fully realised.
4.4. Improvement Action Plan
The following identifies a list of improvement actions identified by the Asset Plan Community Working Group (CWG) during the deliberate engagement
process in November and December 2021.
The improvement action plan is presented in four (4) major themes, namely:
•
Renew before New
| Making the most from existing assets.
•
Deeper Consultation & Engagement
| Better infrastructure decisions are made when the community is involved.
•
Embrace Technology & Innovation
| Find alternate service delivery models. Improve infrastructure services through technology.
•
Build Better
| Build new infrastructure that is smarter, better, and only when an identified need exists.
Plan Improvement and Monitoring
Page 34
Task
Improvement Action
Theme
Responsible
Department
Timeline
1
1
Continue to investigate and implement ways to improve safety, both perceived and real,
in public parks through the implementation of Council’s Creating Better Parks – Open
Space and Playground Policy and Plan.
Embrace Technology &
Innovation
Urban Design
June 2023 &
ongoing
2
Improve the quality, materials, and design standards for new assets, renewed assets,
and in the re-instatement of public works.
Embrace Technology &
Innovation
Asset & Property
Services
June 2023 &
ongoing
3
Better use of technology and innovation to prevent, or at least reduce, the need for
reactive maintenance.
Embrace Technology &
Innovation
Asset & Property
Services
June 2023 &
ongoing
4
Continue to ensure that all community members have equitable access to quality parks
through the implementation of Council’s Creating Better Parks – Open Space and
Playground Policy and Plan.
Build Better
Urban Design
June 2023 &
ongoing
5
Further considerations to be given to products / technologies / materials used in public
infrastructure that are more durable, and more environmentally sustainable.
Embrace Technology &
Innovation
Asset & Property
Services
June 2023 &
ongoing
6
Council to link with volunteers / community groups / working bees to carry out
improvement works in their local parks & reserves.
Deeper Consultation &
Engagement
Park Services / Environment
June 2023
7
Establish a CWG as part of ongoing deliberate community consultation practices, and as
a way to ensure the successful implementation of this Asset Plan.
Deeper Consultation &
Engagement
Communications &
Community Engagement
June 2023
8
Find ways to improve the quality, safety, and appearance of ‘existing infrastructure’ first
before committing to building ‘new infrastructure’.
Renew before New
Asset & Property
Services
June 2023 &
ongoing
9
Design public venues and facilities to accommodate multiple uses / purposes.
Build Better
Leisure & Community
Facilities
June 2023 &
ongoing
Table 4.4.1 – Improvement Action Plan
1
The timelines identified represent an initial target to measure the level of execution by June 2023 for each improvement action. However, this Asset Plan notes that the true success of some
improvement actions can take longer to be realised in real terms, and others remain a continual challenge. As such, this Asset Plan intends to measure and report the performance of each
improvement action on an ongoing basis after the initial target, and continue to do so until it the improvement action is fully realised.